My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil & Partners, Inc. A_City of Sunny Isles Continuing Services for Landscape Architectural Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(22-06-01) Landscape Architectural Services CCNA
>
Responses
>
Bermello Ajamil & Partners, Inc. A_City of Sunny Isles Continuing Services for Landscape Architectural Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 10:17:04 AM
Creation date
6/30/2022 10:15:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38 | CONTINUING SERVICES FOR LANDSCAPE ARCHITECTURAL SERVICES | RFQ 22-06-01 <br />Quality Assurance and Quality Control <br />BA has developed and implemented a thorough and comprehensive Quality Assurance <br />and Quality Control plan (QA/QC). Quality work is the direct result of careful, properly <br />sequenced production, and continuous responsible professional checking of each work <br />element for completion and correctness. <br />The responsible professionals will perform detailed checks for accuracy, errors, and <br />omissions before each document phase submittal review. The standard checking <br />procedure in our Quality Control Manual shall be utilized for production checking. The <br />project manager and the responsible professionals are to continuously monitor and <br />coordinate all aspects of the projects and check the work for inclusion of client review <br />comments and requirements. Furthermore, our team will review all work products <br />before delivery to the City. <br />Our QA/QC team is composed of individuals with backgrounds and experiences that <br />include landscape architecture, architecture, construction management, structural, and <br />MEP engineering. A diverse QA/QC team will ensure that the projects are reviewed and <br />checked from multiple points of view to: <br />• Ensure compliance with program requirements <br />• Ensure conformance with applicable codes <br />• Ensure constructability <br />• Ensure conformance with the construction budget <br />• Ensure that the long-term operation and maintenance of the project is consistent with the City’s expectations <br />The following are the principles behind our QA/QC plan: <br />Keep the BA Team Together for the Duration of the Project <br />As each project begins, BA mobilizes the entire team, who from day one become familiar with the City’s project goals, objectives, <br />and criteria. Projects are not passed on from one group to another during their execution. This insures consistent involvement of <br />the team day one. <br />Listen to the Client <br />At the beginning of each project, BA will work with the City to set project goals and expectations and identify key issues. The BA <br />team then develops conceptual alternative solutions that address the issues and tests each alternative against the goals and <br />criteria to ensure complete and balanced decisions. <br />Document the Progress and Decisions Thoroughly <br />Processes and decisions are documented in detail identifying action items, due dates, and responsible personnel. Accurate <br />record-keeping and communications avoid misunderstandings and costly backtracking. <br />Conduct Methodical Plan Checks and Reviews <br />Reviews are regularly scheduled with pre-published agendas, checkpoints and criteria checks. Any changes are corrected <br />immediately and checked again. These reviews ensure coordination and accuracy among documents, which in turn provide a sound <br />basis for reliable cost estimates and quality control. <br />Doral Central Park, Doral, FL
The URL can be used to link to this page
Your browser does not support the video tag.