My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miller Legg Response to RFQ No 22-06-01 Continuing Services for Landscape Architectural Services CCNA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(22-06-01) Landscape Architectural Services CCNA
>
Responses
>
Miller Legg Response to RFQ No 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 10:25:23 AM
Creation date
6/30/2022 10:23:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 22Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA <br />3. Minimum Qualification Requirements b. Government Contracts <br />City of Miami Morningside Tennis Center <br />Miami, FL <br />The City of Miami Morningside Park created an expanded <br />and improved tennis facility at this 42-acre Park. The project <br />included improvements to an existing seven (7) courts that had <br />experienced degradation due to drainage and soil stabilization <br />issues. A new court layout was developed to increase the facility <br />to eight (8) lighted courts and a warm-up training wall amenity. <br />Other tennis improvements included upgraded lighting, fencing <br />and shaded bench area. A central courtyard was also developed <br />as a key element of the project design. This courtyard creates <br />an inviting area for players and spectators to gather before and <br />after matches. A themed paver field with lush landscaping that <br />embraces large existing ficus trees creates a pleasant gathering <br />space not previously found at Morningside Park, and helps <br />establish it as a premier public tennis destination in the City of <br />Miami. <br />Miller Legg services included civil engineering, landscape <br />architecture, arborist, permitting and limited construction <br />administration to assist the City in the bidding, observation and <br />certification of the project improvements. Arborist services <br />included evaluating existing trees for health, longevity and <br />relocation prospects. Once relocated, the trees were monitored <br />for ongoing wellbeing on site. Apart from the City, other <br />agencies with jurisdiction for this project include Miami-Dade <br />County Department of Environmental Resources (DERM) and <br />South Florida Water Management District (SFWMD). Received <br />the Facility Showcase award by the Florida Recreation & Park <br />Association. Miller Legg secured this project under the firm’s <br />Continuing Services Agreement with the City of Miami. <br />Start / Finish Date: 07/15 - 12/18
The URL can be used to link to this page
Your browser does not support the video tag.