Laserfiche WebLink
Page 32Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA <br />4.1 Firm Qualifications and Experience <br />Plan. The project consisted of creating a go-forward <br />landscape roadmap guide that will be implemented <br />for years to come. Miller Legg conducted a citywide <br />tree inventory assessment, an evaluation of existing <br />landscape, irrigation and hardscape conditions, an <br />overall assessment of the existing character of the road <br />corridors, and an opportunities and constraints analysis. <br />The overall goal was to create a Landscape Master <br />Plan that provides the City with typical conceptual <br />landscape concepts, recommendations, guidelines, and <br />implementation strategies to follow. The Master Plan <br />was unanimously adopted by the City Commission. <br />Miami-Dade County Parks, Recreation and Open Spaces <br />(PROS) Projects – In the past 5 years alone, Miller Legg <br />has performed LA and arborist services for a number of <br />PROS parks projects, such as Greynolds Park Playground <br />Design, Devon Aire Park, South Dade Park, Sabal Chase <br />Park and Curtin Interactive Park. Kendall Soccer Park Turf <br />Replacement as well as providing LA Support Services as <br />an in-house consultant. Miller Legg has also performed a <br />number of other services for PROS, including Surveying <br />and SUE services under a continuing services contract <br />(Underline Brickell Backyard, Kendall Soccer Park Turf <br />Replacement, Oak Grove Park, Matheson Hammock <br />Park) and environmental and civil services for projects <br />such as the Biscayne Everglades Greenway Trail Segment <br />D. <br />Florida Department of Transportation District 6 <br />Biscayne Boulevard - For three sections of the award- <br />winning historic Biscayne Boulevard roadway in the <br />City of Miami, Miller Legg prepared tree removal and <br />relocation for current roadway construction, as well as <br />future planting, hardscape, and site amenity documents. <br />This project required coordination with the Miami <br />Downtown Development Agency (DDA), collection of <br />field data, documentation of the information in graphic <br />and text formats, and coordination of the proposed <br />improvements with local municipalities and community <br />associations. <br />This five-year Biscayne Boulevard revitalization project <br />was part of a multi-year continuing service contract <br />with FDOT District 6. The project was recognized by the <br />Florida Chapter of the American Society of Landscape <br />Architects for Outstanding Design. <br />Multi-disciplinary firm: Miller Legg’s staff members <br />routinely work together on a broad spectrum of projects, <br />and typically on concurrent assignments. A fundamental <br />benefit of our in-house multi-disciplinary environment <br />is that it allows each department to gain first-hand <br />knowledge of the important technical contribution of <br />each other service area in successful project execution. <br />We understand the importance of incorporating both <br />the natural environment and engineered systems to <br />maintain resources from the building level out to the <br />broader landscape level. Our landscape architects <br />enhance the natural setting by creating improved areas <br />that mesh with instead of standing apart from the <br />environment. Our environmental biologists work closely <br />with our engineers and planes throughout project design <br />to ensure critical site elements are preserved, while also <br />identifying potential opportunities to showcase the <br />natural environment. <br />Arborist Services: Miller Legg has found that more and <br />more clients are seeking arborist services in their project <br />scopes. Miller Legg has responded to this demand and <br />we now have four (4) ISA certified arborists on staff. <br />c. UNIQUE SKILLS AND QUALIFICATIONS