Laserfiche WebLink
Page 41Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA <br />4.2. Qualification of Key Personnel Assigned to Engagement <br />Permitting was coordinated through the <br />South Florida Water Management <br />Division, Palm Beach Gardens Fire, <br />Health and Public Works Departments <br />as well as Seacoast Utility Authority. <br /> <br />Town of Lauderdale-By-the-Sea <br />Poinciana/Bougainvillea Roadway <br />and Parking Improvements - Under <br />the firm's Continuing Services Contract, <br />Miller Legg provided design and <br />permitting services for parking, roadway <br />and landscape architectural <br />improvements for the Poinciana Street <br />and Bougainvillea Drive area north of <br />Commercial Boulevard to alleviate <br />congestion along the parallel corridor of <br />SR A1A in the Town of Lauderdale-By- <br />The-Sea. Services include: roadway and <br />parking area design, lighting, utility <br />coordination, permitting, landscape, <br />hardscape and irrigation, and pre- and <br />post-construction observation services. <br /> <br />City of Lauderhill Sports Park - <br />Miller Legg was retained by the City of <br />Lauderhill to provide civil engineering <br />design, stormwater permitting, landscape <br />architecture, irrigation design, <br />construction specifications and bidding <br />assistance services for proposed <br />amenities improvements at the 12-acre <br />Lauderhill Sports Park. Replacement of <br />the baseball field and cricket pitch <br />natural grass with synthetic turf and the <br />football scoreboard replacement tasks <br />have been finalized. Miller Legg has also <br />completed design of the playground area <br />wood chip surface conversion to <br />synthetic turf, playground shade, <br />modifications to portions of the fitness <br />trail and the addition of new fitness <br />stations trail and exercise equipment. <br /> <br />Miami-Dade County Parks, <br />Recreation & Open Space (PROS) <br />Debbie Curtin Interactive Park - <br />Under Miller Legg’s Continuing Services <br />Contract with PROS, Miller Legg was <br />responsible for development of the <br />conceptual rendering plans for this <br />exciting interactive park. Features of the <br />interactive components include musical <br />instruments such as a goblet drum, and <br />vivo metallophone, kettle drum, <br />grandioso chimes, kundu drum, animato <br />metallophone, bongo, hourglass and ring- <br />a-bell panels, textured features such as <br />marble and tracing panels, as well as <br />climbers including a custom rope <br />climber, stone block climb, custom hill <br />net, a bobble rider single and double and <br />a global motion freestanding play <br />structure. The conceptual plans were <br />presented to the County. The firm was <br />also responsible for developing <br />construction documents. <br /> <br />City of Coral Gables War Memorial <br />Youth Center Landscape & <br />Engineering - This City of Coral <br />Gables 7-acre War Memorial Youth <br />Center in Miami Dade County <br />represents a living memorial to Coral <br />Gables World War II veterans. The <br />project includes improvements to multi- <br />purpose athletic fields. Miller Legg was <br />responsible for the landscape <br />architecture, civil engineering design and <br />permitting of the improvement program. <br />Specific improvements included athletic <br />field drainage, re-sodding with Bermuda <br />"Celebration" turf and irrigation design. <br />The irrigation system ties into a non- <br />potable well system. Drainage <br />improvements consist of subsurface field <br />improvements that integrate with the <br />existing exfiltration and subsurface <br />drainage systems. Additional services <br />provided include: design development, <br />final construction documents, and <br />construction administration. Miller Legg <br />collaborated with MC Harry Associates <br />on this project. <br /> <br />City of Pembroke Pines D/B Taft <br />Street Improvements - Miller Legg <br />was on the RJ Behar team for this Taft <br />Street Design Build project for the City <br />of Pembroke Pines. The firm's scope of <br />services was landscape architectural <br />design and post design services and <br />included the development of design and <br />contract documents including plans and <br />specifications. Support during the <br />construction phase with Requests for <br />Information and contractor submittals <br />was also provided. <br /> <br />City of Miami Museum Park <br />Baywalk Phase 3 - Miller Legg <br />provided landscape architecture, civil <br />engineering, lighting/electrical <br />engineering, surveying, permitting and <br />limited construction administration <br />services for the Miami Baywalk Phase 3 <br />Project. Permitting for project <br />improvements was provided through the <br />City of Miami, Miami-Dade County and <br />South Florida Water Management <br />District. Underground utility designation <br />for electric and drainage utilities was <br />performed.The project is a 1/4 mile <br />pedestrian-oriented urban waterfront <br />park and promenade on Biscayne Bay, <br />located adjacent to the east coast <br />greenway. It provides a unique open <br />space that links the American Airlines <br />Arena, Biscayne Boulevard, and Museum <br />Park. The Baywalk design includes <br />custom native stone benches, extensive <br />paver pedestrian spaces, salt-tolerant <br />tropical plantings, as well as themed <br />lighting and site amenities. Due to <br />historic maritime activities in the project <br />area, soil conditions were addressed <br />through the design of unique drainage <br />facilities that minimized potential <br />groundwater impacts. The Baywalk <br />design solution also improved visibility <br />and lighting in the area to discourage <br />vagrancy issues that existed. The planting <br />design not only enhanced aesthetics, but <br />also buffered unsightly adjacent parking <br />and utility areas and minimized exposed <br />surfaces that had been subject to graffiti. <br />This project was performed under our <br />Miscellaneous Landscape Architectural <br />Services contract. <br /> <br />Greater Boca Raton Beach and <br />Parks District Ocean Breeze <br />Master Plan - Miller Legg was retained <br />by the Greater Boca Raton Beach and <br />Parks District (GBRBPD) to prepare a <br />Master Plan for Ocean Breeze Park, site <br />of the former Boca Teeca Country Club <br />and Golf Course. The Master Plan will <br />reflect the District's desire to provide a <br />diverse recreational amenity at this 212- <br />acre property for City residents while <br />considering the specific desires and <br />concerns of the adjacent residential <br />communities. The Plan will address <br />Ocean Breeze's future facilities, uses, <br />programs, operation, maintenance and <br />funding and recommend Park <br />modifications, improvements, <br />enhancements and additional uses. <br />Recreational elements may include <br />passive park facilities (trails, walking <br />paths, open fields/areas), golf <br />course/facilities, active park uses <br />(playgrounds, tennis courts, sport courts, <br />aquatics), community center/facilities and <br />potential revenue-generating <br />opportunities.