My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3444
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 9:29:54 AM
Creation date
1/6/2023 12:57:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3444
Date (mm/dd/yyyy)
12/15/2022
Description
Approving 1st Amnd w/ Keith and Associates, Inc. for Civil Engineering and Landscape Architectural Svcs for Bella Vista Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 2, 2022 / Page 3 of 15 <br />Bella Vista Park I Number 11723.04 <br />City of Sunny Isles Beach <br />Contract Addendum # 1 <br />Periodic Site Visits and Construction Observation <br />KEITH shall visit the Project at intervals appropriate to the various stages of construction, as KEITH deems <br />necessary to observe as an experienced and qualified design professional to review the progress and quality <br />of the various aspects of the contractor's work. KEITH shall coordinate and attend one (1) Pre -construction <br />Meetings. If required by the CLIENT, KEITH shall attend or participate in CLIENT scheduled coordination <br />and progress meetings or telephone conferences. These services will be invoiced on a time and material <br />basis in accordance with our Professional Service Fee schedule (attached). Re -tests and failed inspections <br />will be invoiced based on this same Fee schedule. <br />Issue Clarifications <br />KEITH shall issue all instructions and revisions of the CLIENT to Contractor(s); issue necessary <br />interpretations and clarifications of the contract documents; have authority, as the City's representative <br />to require special inspection or testing of the work; act as initial interpreter of the requirements of the <br />contract documents and judge of the acceptability of the work there under, and make decisions on all <br />claims of the CLIENT and contractor(s) relating to the acceptability of the work or the interpretation of the <br />requirements of the contract documents pertaining to the execution and progress of the work. <br />As-builts Review <br />KEITH will review the record drawings (as-builts) to ensure substantial conformance to the approved plans. <br />KEITH will only review and reject any particular as -built plans set a maximum of two (2) times, any additional <br />review will be considered additional services. The contractor will be expected to have the as-builts revised <br />in accordance with all comments. <br />Final Inspections <br />KEITH shall participate, with the CLIENT's representative, in a semi-final inspection for the purpose of <br />determining if the project is substantially complete and participate in the preparation of a written "Punch List" <br />of all incomplete, defective or deficient items. Upon notice from the CLIENT, participate in a final inspection <br />together with CLIENT and contractor representatives to assure that all "Punch List" items are complete, and <br />the work is indeed completed in accordance with all contract documents. Upon completion of the final <br />inspection, certify, in writing, that the work in-place is acceptable, subject to any conditions therein <br />expressed. This service is anticipated to be two (2) inspections, additional inspection(s) will be invoiced <br />based on the attached Fee schedule. <br />Final Certification <br />KEITH will prepare final certification to all appropriate permitting agencies utilizing record drawings for the <br />design from the survey information supplied by the contractor, or by other means agreed to by both KEITH <br />and CLIENT. <br />Note: It is the Contractor's responsibility to coordinate through KEITH the scheduling of testing. KEITH shall <br />represent the CLIENT in performing periodic observation of construction as necessary to confirm <br />construction is in accordance with the approved plans. <br />The Construction Engineering and Certification for the work is for an anticipated period of one (1) month <br />beyond the construction completion date for certifications. <br />We anticipate the following items requiring as -built certification: <br />• Water System <br />• Sanitary Sewer System <br />• Paving Grading and Drainage System <br />Z Engineering Inspired Design. <br />87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.