My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Disaster Program & Operations, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 23-04-02 Disaster Monitoring Services & Financial Recovery Assistance
>
Responses
>
Disaster Program & Operations, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 12:34:28 PM
Creation date
5/17/2023 12:30:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> <br /> <br />field recon team will gather all missing FEMA required information (dimensions, quantities, etc.) to ensure <br />complete accurate disaster work is verified for FEMA reimbursement. <br />Contractor Invoice Records Reconciliation Team: This team is reconciling all SCPS contractor invoices with <br />payments, SCPS workorders, and backup daily logs detailing contractor’s work. The team is reviewing the <br />contractor invoice with the contract line items to identify discrepancy for the need for change orders and <br />contractor addendums in order to qualify for FEMA reimbursement. <br />CAT B Emergency Services Recon Team: This team is reviewing an assimilating force labor disaster cost, <br />revieing payroll records, cross referencing disaster work performed. Force equipment is being reconciled for each <br />of the SCPS staff vehicles used for disaster pre and post disaster emergency services. The force equipment will <br />be crossed reference and matched with the force labor. Materials: All SCPS materials used in stock will be <br />reconciled and cross reference to SCPS work orders, vendor PO’s, invoices and payments made. Material <br />purchased are being reconciled with vendor PO, vendor payments and vendors payments. <br />FEMA recovery scoping meeting (RSM) and Damage Assessment Inventory Team: DP&O represents SCPS <br />with all FEMA meetings and site inspections. DP&O is preparing a detailed damage inventory so that FEMA <br />can create the projects for disaster reimbursement. DP&O is grouping the projects to the best financial benefit <br />for SCPS (for example, projects that are 100% work completed are being grouped by either school zone and per <br />roofs interior and exterior) this will allow SCPS to submit projects less then 100 million for quicker FEMA <br />review and project obligation. Larger projects which included work to complete and can quality for hazard <br />mitigation, DP&O is grouping these project to best qualify for hazard mitigation (example, storm drains and roof <br />projects). <br />Flooded Storm Drains and Culverts Team & Erosion areas: DP&O mobilize Ray Valdes, Jose Arocha, <br />Fabiana Cova, DP&O’s Task Managers to assess each of the School’s campus Flooded Storm Drains and <br />Culverts. SCPS did not have the storm drains mapped, so DP&O used our BOLT EOC mobile app to GPS <br />map all storm drains and culverts at each of the 80 Schools campuses including photos and details of the <br />flood disaster debris. Urban Hammarstedt, DP&O’s Operations Manager detailed a plan of action to identify <br />all flood disaster debris hazards at each of the 80 SCPS campuses and included a plan to prioritize high flood <br />risk schools and coordinate the storm drain and covert clean out with the SCPS contractor. <br />DP&O is performing is monitoring of the flood storm drain and covert clean out with the FEMA documentation <br />including date, time location, with maps photos. <br />Erosion Areas: Due to the massive flooding many of the school campuses have severe erosion where sidewalks, <br />asphalt parking areas are damaged, retention ponds sumps not functioning, and where storm drains are pushed <br />up with surrounding infrastructure damaged due to massive water force. DP&O is documenting these areas with <br />GPS mapping and photos with details to qualify SCPS for flood hazard mitigation. <br />DP&O is Florida Schools Contractor Certified. All DP&O staff hold Florida School Contract badges <br />allowing us to work at school properties. <br />CITY OF FLORIDA CITY, FLORIDA: Project Description: Hurricane IRMA Monitoring & Debris <br />Management; Pre-Disaster Response and Recovery Planning; Disaster Emergency / Recovery Services; FEMA <br />PA Program Management; Hazard Mitigation Grant Management/ COVID-19 FEMA Recovery; CARES <br />ACT Recovery <br />Contract Date: September 2016 – Current Cubic Yard: 300,000 cy Client Contact: Eugene Leon, Project Mgr – (C) 786-304-8230 Email: proj-mngr@floridacityfl.gov Jennifer Evelyn, City Clerk – (C) 305-242-8218 Email: cityclerk@floridacity.gov Address: 404 W Palm Dr, FL City, FL 33034: DR 4337
The URL can be used to link to this page
Your browser does not support the video tag.