My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TFR Enterprises Inc
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-04-01) Disaster Debris Management and Disposal Services
>
Responses
>
TFR Enterprises Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 12:53:29 PM
Creation date
5/17/2023 12:48:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Pre-Strike Procedures <br />48-72 hours before anticipated landfall: Both the President and Director of Operations of TFR Enterprises, Inc. <br />have been monitoring and tracking “Mock” hurricanes through local communication and weather channels. <br /> <br />The Director of Operations will contact the known designated Government Representatives and provide them <br />with the primary and secondary, 24-hour emergency contact personnel and points of contact (e-mail and cell <br />phone). <br /> <br />The Contract Administrator in the home office will produce a list of known, experienced subcontractors from the <br />database and sort the list by State (a list can be provided upon request) *Note: The subcontractors listed as pre- <br />qualified are companies familiar with TFR procedures and expectations. In past projects, these subcontractors <br />have been successful in operating alongside TFR and thoroughly vetted. <br /> <br />Project Managers will each be given a group of these subcontractors to contact. Each Project Manager will begin <br />calling the subcontractors and make the following determinations for each and in aggregate: <br />• Current equipment and personnel on hand and available to commit if tasked. <br />• Best-estimated anticipated response time if tasked. <br />• Plans for housing, feeding personnel, and fuel supply resources. <br /> <br />During this same period, the Service Manager in the home office will begin calling Equipment Rental Dealers to <br />identify available equipment on hand, such as Rubber Tired Front End Loaders, Skid Steer Loaders, Grapple <br />attachments, Knuckleboom Loaders, Bucket Trucks, Vacuum Trucks, Water Trucks, Bulldozers, Portable <br />Generators, and Portable Toilets, to augment, if necessary, TFR owned equipment. Also, the Service Manager <br />will prepare preliminary tracking routes for Company-owned equipment and determine what states and what <br />permits may be required if tasked. <br /> <br />An evaluation of the information gathered from the Subcontractors who have been contacted and an estimated <br />crew/response capability will be made in the following priority: <br />1) Subcontractors on a call with Emergency Road Clearing Equipment. <br />2) Subcontractors on a call with Loading and Hauling Equipment. <br />3) Subcontractors on a call with Site Management Equipment. <br /> <br />This information will be added to the estimated crew/response capability of TFR’s Company-owned equipment <br />and personnel, and a preliminary mobilization schedule will be prepared. <br /> <br />24-48 hours before anticipated landfall: The Service Manager will begin acquiring trip permits for dispatching <br />the initial transport of heavy equipment (debris clearing and site preparation equipment) to the designated staging <br />area. <br /> <br />Loading and Hauling equipment and personnel will be dispatched to the designated staging area as well as mobile <br />campers and temporary housing units. <br /> <br />The experienced subcontractors previously notified will be contacted by the Project Managers and placed on <br />standby, if necessary. Their mobilization capability and preparedness will be noted and updated in the preliminary <br />crew assessment. <br /> <br />0-24 hours before anticipated landfall: Upon notification of the Government Representative, or at the discretion <br />of the Director of Operations, the Pre-Execution Planning Team (Operations Manager, Operations Planner, <br />Project Managers, Environmental Health and Safety Officer, and the Program/QC Manager) will deploy. <br /> <br />ITB No. 23-04-01 <br />Disaster Debris Management and Disposal Services <br />76
The URL can be used to link to this page
Your browser does not support the video tag.