|
O
<br />STAFFING
<br />RESUMES E SCIENCES
<br />Justin Freedman, MS
<br />Page 2
<br />Sea Turtle Protection, Lighting Analysis, City of Dania Beach, Broward County, Florida — For this project, Mr. Freedman
<br />assessed beachfront lighting for general condition and sea turtle friendliness (compliance with Section 62B -55, FAC) and provided
<br />recommendations to the City to bung fighting into compliance.
<br />Grandview Palace Marina Permitting Support, Glasgow Equipment, North Bay Village, Miami -Dade County, Florida -
<br />Glasgow equipment contacted Mr. Freedman to assist with a contentious permitting issue through the FDEP. He provided technical
<br />support, resulting in permit issuance.
<br />Benthic Resources Survey and Permitting for Conduit Under Bear Cut, Miami -Dade County, Florida — Mr. Freedman
<br />provided environmental assessment and permitting support for the installation of approximately 2,550 linear feet of conduit
<br />located along the ocean side of the Bear Cut Bridge of the Rickenbadker Causeway in Miami -Dade County, Florida. E Sciences
<br />conducted a wetland delineation, seagress survey, benthic habitat survey and delineated extents of mangroves within the
<br />project area. E Sciences subsequently worked with the design engineers to develop construction methodologies to minimize
<br />resource impacts and thereby minimize permitting requirements. Due to dose coordination with agency regulators and design
<br />engineers, the project will qualify for a Standard General Environmental Resources Permit from the FDEP. Additionally since the
<br />project will avoid impacts to mangroves Miami -Dade County authorization will not be required for the project, saving valuable
<br />time and money for the project.
<br />Canopy Analysis, City of Miami Beach, Miami -Dade County, Florida — Mr. Freedman served as the project manager for this
<br />canopy analysis project for the City of Miami Beach, which was conducted under E Sdeinces' General Environmental Engineering
<br />Services contract for the City. Using i -Tree Canopy, Mr. Freedman and his team estimated the canopy coverage for the City's
<br />urban forest, as well as percentage of available space remaining within the City for additional tree planting. Mr. Freedman
<br />developed a one -page brochure for public education documenting the information from the study.
<br />General In -mouse Environmental Services, FOOT District Four, Florida — Mr. Freedman served three days a week as in-
<br />house environmental specialist in the FOOT District Four Planning and Environmental Management (PL &EM) Office. Work
<br />induded performing environmental phase reviews and preparing and reviewing NEPA documentation for over 70 roadway and
<br />bridge projects including field identification of fisted species habitat, wetlands, historic resources, Section 4(f) and contaminated
<br />sites.
<br />Environmental Review I NEPA Documentation for SR A1A, Hallandale Beach, Broward County, Florida — Mr. Freedman
<br />provided environmental review and NEPA recommendations for DAP project along SR A1A. Concerns included sea lurtle{riendly
<br />lighting.
<br />Monroe County Pedestrian Path, Monroe County, Florida — Mr. Freedman provided permitting support services to Monroe
<br />County for a pedestrian path in Key Largo. This project included the design and pemmitdng for the path, which man adjacent to areas
<br />of tropical hardwood hammock, and a pedestrian bridge over Marvin D. Adam's Waterway. During the design phase for this project,
<br />Mr. Freedman mapped trees along the corridor and worked with designers to avoid impacting valuable bees, including trees
<br />constihrting natural areas adjacent to the roadway and individual landscape trees that were likely to provide shade for pedestrians.
<br />Where possible, Mr. Freedman provided notes to instruct where roots and limbs could be trimmed back to provide access. He also
<br />conducted a benthic resources survey within the proposed bridge footprint over the Marvin D. Adam's Waterway. Using SCUBA and
<br />a team of divers and structural engineers, Mr. Freedman documented resources for use in acquiring project permits.
<br />Vizcaya Museum and Gardens, City of Miami, Miami -Dade County, Florida — This project involved a multi-disciplinary
<br />landscape architecture and environmental restoration plan for the waterways and tidal pool within the museum's property, which
<br />balanced ecological function with creative landscape aesthetics, recreational functions and values, and improvements to water
<br />quality, and planting designs based on historic from inventories, including mangroves, native hardwood hammock and coastal
<br />scrub species. Mr. Freedman served as the project manager for the construction administration portion of this project, including
<br />evaluating contractor qualifications and conducting compliance inspections.
<br />CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02
<br />102
<br />
|