My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil & Partners, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Bermello Ajamil & Partners, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:23:40 AM
Creation date
8/18/2014 4:33:06 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.1�, ENGINEERING <br />a I ienaes ENVIRONMENTAL <br />ECOLOGICAL <br />Ms. Locke has been providing professional environmental and engineering <br />consulting services for over 26 years. During her career, she has worked in <br />many facets of environmental consulting including environmental audits, <br />assessment and remediation, stormwater design, sanitary sewer planning, <br />environmental permitting, climate change impact evaluation, grant assistance, <br />mitigation design, Brownfields, community involvement, and training. Ms. Locke <br />has provided litigation support for the FOOT, Miami -Dade Aviation Department <br />and private entities. She also serves as E Sciences' Corporate Quality <br />Assurance Officer. <br />Ms. Locke previously managed an environmental department for a large <br />engineering firm in Miami -Dade County for over six years. She is a former <br />President of the South Florida Association of Environmental Professionals and <br />served as a commission-appointee to the Broward County Brownfields <br />Redevelopment Task Force and the City of Fort Lauderdale Community <br />Advisory Board. Ms. Locke is a Board Member for the Smart Gmwth Partnership <br />and is their liaison to the Broward County Metropolitan Planning Organization. <br />She is also the Current President -Elect for the Florida Brownfields Association <br />and is served as Co Chair for the FBA's 16" annual Conference in 2013. <br />STAFFING <br />RESUMES E SCIENCES <br />Nadia G. Locke, P.E. <br />Associate / Senior Engineer <br />Education <br />B.S. Materials Science and Engineering, <br />University of Florida, 1988 <br />Professional Licenses! Certifications <br />Professional Engineer: FL -58676 <br />LEED Green Associate <br />Certified FDEPStormwater, Erosion and <br />Sedimentation Control Inspector and <br />Instructor. - <br />OSHA 40 Hour HAZWOPER / 8 Hour Site <br />Supervisor - - <br />NAUUPADI Advanced Open Water Diver <br />Years of Experience <br />26 <br />Project Experience <br />General Environmental Engineering Services, City of North Miami Beach, Miami -Dade County, Florida — Ms. Locke <br />provides ongoing environmental support to the City of North Miami Beach under E Sciences' general environmental engineering <br />services contract. She was the engineer of record for the City's largest environmental cleanup project, Taylor Park, and has <br />conducted several Phase I ESAs for the City. Ms. Locke held community meetings and has presented at CRA and City Council <br />meetings. <br />Taylor Park, City of North Miami Beach, Miami -Dade County, Florida — Taylor Park has been slated for redevelopment <br />since 1999, when the FDEP had their Brownfields contractor conduct a Brownfields Assessment of the site. The assessment <br />revealed metals and petroleum in the soil and metals in the groundwater. In 2005, assessment activities revealed the presence <br />of buried solid waste on most of the 21.8 -acre property. Since that time, environmental issues have continued to restrict and <br />complicate redevelopment efforts for the property. The property is currently occupied by an inactive ball field, an operating <br />daycare facility, vacant land and a lake. Ms. Locke was the engineer of record and project manager for the assessment and <br />conceptual remediation design for the property. The remediation planning was closely coordinated with the community desires, <br />the City's needs and the park master planners to ensure a solution to remedy the environmental issues in conjunction with all of <br />the stakeholder needs. She represented the City in two meetings with residents and other public meetings. <br />Greynolds Park Renovations, Preliminary Evaluation Report, North Miami Beach, Miami -Dade County, Florida — This <br />park is currently owned by Miami -Dade County and is used as a recreational park housing a variety of amenities, including a <br />man -made lagoon and bird rookery. The intended hydrologic function of the park was based on historic tidal influences; however <br />restricted flows to the rookery and lagoon have resulted in a degraded lagoon and substantially reduced bird population. This <br />project was developed to identify issues that must be addressed to return the ecosystem to a more naturally productive state <br />and improve the beneficial use of the park by enhancing and restoring the diminished hydrologic and biological function of the <br />rookery. Ms. Locke provided the evaluation of the hydrologic function of the system and provided overall technical review of the <br />reports prepared. <br />General Environmental Engineering Services, City of Miami Beach, Miami -Dade County, Florida — Ms. Locke provides <br />ongoing services to the Support the City of Miami Beach under E Sciences' general environmental engineering contract. Under <br />this contract, Ms. Locke is currently conducting a citywide sea level rise evaluation. She was also the engineer of record for Spill <br />Prevention Control and Countermeasure Plans (SPCCs) for twelve facilities throughout Miami Beach, and for engineering <br />CONTINUING PROFESSIONAL SERVICES I REG NO. 14 -07 -02 <br />103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.