My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil & Partners, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Bermello Ajamil & Partners, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:23:40 AM
Creation date
8/18/2014 4:33:06 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROACH / METHODOLOGY <br />The Quality Control Principles we will utilize to Control Costs and Maintain the Schedule are: <br />Keep the Team Together for the Duration of the Project: The nature of this contract is such that with a <br />team of professionals who have gone through the learning curve, understanding needs, prioritizing <br />responsibilities and preparing documentation to complete assignments the project tasks and milestones <br />will become easier and faster to complete. The end result is less cost and faster results as the project <br />progresses from concept through construction. <br />Listen to the Client: Nobody knows this project better than you, the Client. It is our job to translate your <br />wishes and concepts through the creative process. Our team experience allows us to quickly gather <br />the information you have available so we can ask the pertinent questions. This simple, effective and <br />necessary step will allow us to communicate with you from the beginning. <br />Document the Progress and Decisions Thoroughly: After listening to you, reaching conclusions and <br />determining direction we will document the discussions and what was agreed. Meeting minutes will be <br />issued to all present and to team members, affected or not, to ensure record keeping, memorializing <br />the interaction and for the purposes of tracking responses, deliverables, milestones as well as utilizing <br />this tool to track the schedule. <br />Conduct Methodical Plan Checks and Reviews: We will establish and schedule plan checks and reviews. <br />Agendas, lists of hot issues and criteria will be gathered before the checks, reviews and coordination <br />efforts. Focused, targeted and goal minded meetings will run regularly to keep the project on track, on <br />schedule, coordinated and within the bounds of the QCP. <br />Project Schedule Maintenance: Our team will participate in the preparation of the initial schedule for <br />this assignment. Maintaining a schedule allows realistic goals to be met, tasks to be identified and <br />interrelationships to take place. These efforts foster communications for the benefit of cooperation <br />and coordination of efforts and results. The maintenance of a project schedule is the best way to add, <br />reduce and manage contingency plans for all interacting participants. <br />When the project reaches the construction phase, we will assure that every effort is made to see that <br />construction proceeds in accordance with the contractual requirements, plans, specifications, and <br />applicable codes in force at the time of permitting. As part of this quality control process, samples of <br />materials, shop drawings, mock -ups, etc., may be required prior to the commencement of the physical <br />work of that component from various contractors or subcontractors to establish acceptable levels of <br />workmanship. A control process is then put in place to document and ensure that these goals are delivered, <br />while maintaining direct communication with the City staff to advise on the status of approved work, <br />specification infractions and corrective measures. The purpose of this ongoing program is to assure the <br />implementation of the project is in accordance with the contractual requirements, plans, specifications, <br />applicable codes, accepted industry standards and within a predetermined cost and time framework. <br />Permitting Management Approach <br />The key to successfully and rapidly acquiring permits requires a clear understanding of the time frames <br />associated with each permit and a carefully crafted permitting plan that takes advantage of permits that <br />can be applied for in parallel therefore reducing the length of the permitting phase of the project. The <br />C� CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 <br />113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.