Laserfiche WebLink
0 <br />0 <br />0 <br />O <br />0 <br />0 <br />0 <br />STAFFING <br />RESUMES BERMELLO AJAMIL & PARTNERS, INC. <br />Alfredo Sanchez, AIA, AICP, LEED AP <br />Partner, Project Manager <br />Alfredo Sanchez is a Florida -registered architect and AICP- Certified planner with more than 25 <br />years of experience in architecture and urban planning and design. Mr. Sanchez has directed <br />a number of major planning studies and urban design plans in the Miami area and throughout <br />the world. His project experience encompasses city wide master plans, corridor plans, major <br />reconstruction efforts, pedestrian improvements, urban, retail and mixed -use development <br />projects, land planning projects including redevelopment and design of new communities, <br />and seaport master plans. Apart from his extensive experience, Mr. Sanchez's strength lies in his <br />understanding of project methodology and approach. This solid foundation is complemented <br />by his ability to understand all aspects of a project, from the initial economic feasibility analysis <br />to the ultimate impact and image of the project architecture. <br />REGISTRATION <br />Registered Architect, State of South Creek Neighborhood Landscape Improvements, Coconut Creek, Floddo - Senior Planner. <br />Florida. 1979 B &A developed a landscape improvements plan. Neighborhood meetings played a key role <br />Reg. No. AR 0007969 in gathering information about concerns and preferences. They focused on issues important <br />to the residents and have been critical in forming the basis of the study. This will be used in the <br />Registered Architect, Colegio planning and design of the sfreetscopes, signage, traffic calming and general neighborhood <br />Federodo de Ingenieros y landscape improvements. Coconut Creek has commissioned a new design for the main <br />Arquilectos. Costo Rica. 1985 roadway bordering South Creek. B &A will build on the improvements proposed in that plan to <br />American Institute of Certified enhance the quality of the gateways into the neighborhood. B &A's final design solutions will <br />Planners. 1994 form o framework for the city in implementing projects as funding becomes available. <br />Certified General Contractor, <br />RELEVANT EXPERIENCE <br />2004 (inactive) <br />Beach Plaza Redevelopment and Public Beach Revitalization Design, Pompano Beach, Florida <br />- Project Manager for the planning and urban design of the Pompano Beach Boulevard beach <br />CERTIFICATION <br />LEED AP Certification, 2007 <br />front redevelopment. A controversial project that balanced the interests of the local residents, <br />EDUCATION <br />City and County access concerns in the redevelopment of Pompano Beach Boulevard and <br />Master of Architecture, <br />University of Pennsylvania, 1978 <br />adjacent sites that are presently used for surface parking, a pump station to be relocated and <br />American Institute of Certified <br />a beach front restaurant that leads to the Pompano Beach Fishing Pier. The thrust of the design <br />Master of City Planning, <br />addresses the relocation of the previously mentioned uses and the bending of the Pompano <br />University of Pennsylvania, 1978 <br />Beach Boulevard to create an expanded beach front restaurant and pier access site, new park <br />AWARDS <br />open space and a proposed parking structure to accommodate 500 vehicles and maintain <br />Bachelor of Architecture, <br />public access to the beach. The project addressed numerous issues of waterfront development <br />University of Florida. 1972 <br />including engineering, sea turtle protection and beach dune restoration. <br />REGISTRATION <br />Registered Architect, State of South Creek Neighborhood Landscape Improvements, Coconut Creek, Floddo - Senior Planner. <br />Florida. 1979 B &A developed a landscape improvements plan. Neighborhood meetings played a key role <br />Reg. No. AR 0007969 in gathering information about concerns and preferences. They focused on issues important <br />to the residents and have been critical in forming the basis of the study. This will be used in the <br />Registered Architect, Colegio planning and design of the sfreetscopes, signage, traffic calming and general neighborhood <br />Federodo de Ingenieros y landscape improvements. Coconut Creek has commissioned a new design for the main <br />Arquilectos. Costo Rica. 1985 roadway bordering South Creek. B &A will build on the improvements proposed in that plan to <br />American Institute of Certified enhance the quality of the gateways into the neighborhood. B &A's final design solutions will <br />Planners. 1994 form o framework for the city in implementing projects as funding becomes available. <br />Certified General Contractor, <br />City Wide Parks Master Plan, Hallandale Beach, Florida - Project Manager. The City Wide Master <br />2004 (inactive) <br />Plan consisted of a holistic analysis of City residents passive and active recreation needs. A <br />rigorous recreation needs analysis was undertaken to provide the basis for park facilities <br />CERTIFICATION <br />LEED AP Certification, 2007 <br />improvements. An extensive community involvement program was undertaken to incorporate <br />community needs and desires for park and recreation facilities and services. Specific park <br />PROFESSIONAL AFFILIATIONS <br />designs and improvement plans were provided for the each of the City's fourteen parks. <br />American Institute of Certified <br />Planners, 1994 <br />City Wide Parks Master Plan, Pompano Beach, Florida - Project Manager. With forty -one park <br />facilities and a population of nearly 100,000 inhabitants, the City contracted the B &A team to <br />AWARDS <br />carry out a needs analysis, evaluate existing park facilities and create a City Wide Parks Master <br />Miami Chapter American <br />Institute of Architects <br />Plan to address short and long term park improvements in the City. <br />"Urban Planner of the Year" <br />2006 <br />Collier Neighborhood Development Master Plan, Pompano Beach, Florida - Senior Planner and <br />Urban Designer of the Concept Master Plan for the Collier Neighborhood. Public involvement <br />was a major component of the project scope. Scope was comprised of 4 deliverables: (1) <br />assessment of existing conditions to include a functional analysis of the area: (2) assessment of <br />issues and opportunities present that affect the development of the neighborhood: (3) a fist of <br />recommendations and projects to include cost estiamtes and possible funding sources and (4) <br />the delivery of the final Colter Neighborhood Development Concept Master Plan Report. <br />Cba "„r. .._ <br />CONTINUING PROFESSIONAL SERVICES I RFa NO. 14 -07 -02 <br />78 <br />