|
0
<br />0
<br />0
<br />O
<br />0
<br />0
<br />0
<br />STAFFING
<br />RESUMES BERMELLO AJAMIL & PARTNERS, INC.
<br />Alfredo Sanchez, AIA, AICP, LEED AP
<br />Partner, Project Manager
<br />Alfredo Sanchez is a Florida -registered architect and AICP- Certified planner with more than 25
<br />years of experience in architecture and urban planning and design. Mr. Sanchez has directed
<br />a number of major planning studies and urban design plans in the Miami area and throughout
<br />the world. His project experience encompasses city wide master plans, corridor plans, major
<br />reconstruction efforts, pedestrian improvements, urban, retail and mixed -use development
<br />projects, land planning projects including redevelopment and design of new communities,
<br />and seaport master plans. Apart from his extensive experience, Mr. Sanchez's strength lies in his
<br />understanding of project methodology and approach. This solid foundation is complemented
<br />by his ability to understand all aspects of a project, from the initial economic feasibility analysis
<br />to the ultimate impact and image of the project architecture.
<br />REGISTRATION
<br />Registered Architect, State of South Creek Neighborhood Landscape Improvements, Coconut Creek, Floddo - Senior Planner.
<br />Florida. 1979 B &A developed a landscape improvements plan. Neighborhood meetings played a key role
<br />Reg. No. AR 0007969 in gathering information about concerns and preferences. They focused on issues important
<br />to the residents and have been critical in forming the basis of the study. This will be used in the
<br />Registered Architect, Colegio planning and design of the sfreetscopes, signage, traffic calming and general neighborhood
<br />Federodo de Ingenieros y landscape improvements. Coconut Creek has commissioned a new design for the main
<br />Arquilectos. Costo Rica. 1985 roadway bordering South Creek. B &A will build on the improvements proposed in that plan to
<br />American Institute of Certified enhance the quality of the gateways into the neighborhood. B &A's final design solutions will
<br />Planners. 1994 form o framework for the city in implementing projects as funding becomes available.
<br />Certified General Contractor,
<br />RELEVANT EXPERIENCE
<br />2004 (inactive)
<br />Beach Plaza Redevelopment and Public Beach Revitalization Design, Pompano Beach, Florida
<br />- Project Manager for the planning and urban design of the Pompano Beach Boulevard beach
<br />CERTIFICATION
<br />LEED AP Certification, 2007
<br />front redevelopment. A controversial project that balanced the interests of the local residents,
<br />EDUCATION
<br />City and County access concerns in the redevelopment of Pompano Beach Boulevard and
<br />Master of Architecture,
<br />University of Pennsylvania, 1978
<br />adjacent sites that are presently used for surface parking, a pump station to be relocated and
<br />American Institute of Certified
<br />a beach front restaurant that leads to the Pompano Beach Fishing Pier. The thrust of the design
<br />Master of City Planning,
<br />addresses the relocation of the previously mentioned uses and the bending of the Pompano
<br />University of Pennsylvania, 1978
<br />Beach Boulevard to create an expanded beach front restaurant and pier access site, new park
<br />AWARDS
<br />open space and a proposed parking structure to accommodate 500 vehicles and maintain
<br />Bachelor of Architecture,
<br />public access to the beach. The project addressed numerous issues of waterfront development
<br />University of Florida. 1972
<br />including engineering, sea turtle protection and beach dune restoration.
<br />REGISTRATION
<br />Registered Architect, State of South Creek Neighborhood Landscape Improvements, Coconut Creek, Floddo - Senior Planner.
<br />Florida. 1979 B &A developed a landscape improvements plan. Neighborhood meetings played a key role
<br />Reg. No. AR 0007969 in gathering information about concerns and preferences. They focused on issues important
<br />to the residents and have been critical in forming the basis of the study. This will be used in the
<br />Registered Architect, Colegio planning and design of the sfreetscopes, signage, traffic calming and general neighborhood
<br />Federodo de Ingenieros y landscape improvements. Coconut Creek has commissioned a new design for the main
<br />Arquilectos. Costo Rica. 1985 roadway bordering South Creek. B &A will build on the improvements proposed in that plan to
<br />American Institute of Certified enhance the quality of the gateways into the neighborhood. B &A's final design solutions will
<br />Planners. 1994 form o framework for the city in implementing projects as funding becomes available.
<br />Certified General Contractor,
<br />City Wide Parks Master Plan, Hallandale Beach, Florida - Project Manager. The City Wide Master
<br />2004 (inactive)
<br />Plan consisted of a holistic analysis of City residents passive and active recreation needs. A
<br />rigorous recreation needs analysis was undertaken to provide the basis for park facilities
<br />CERTIFICATION
<br />LEED AP Certification, 2007
<br />improvements. An extensive community involvement program was undertaken to incorporate
<br />community needs and desires for park and recreation facilities and services. Specific park
<br />PROFESSIONAL AFFILIATIONS
<br />designs and improvement plans were provided for the each of the City's fourteen parks.
<br />American Institute of Certified
<br />Planners, 1994
<br />City Wide Parks Master Plan, Pompano Beach, Florida - Project Manager. With forty -one park
<br />facilities and a population of nearly 100,000 inhabitants, the City contracted the B &A team to
<br />AWARDS
<br />carry out a needs analysis, evaluate existing park facilities and create a City Wide Parks Master
<br />Miami Chapter American
<br />Institute of Architects
<br />Plan to address short and long term park improvements in the City.
<br />"Urban Planner of the Year"
<br />2006
<br />Collier Neighborhood Development Master Plan, Pompano Beach, Florida - Senior Planner and
<br />Urban Designer of the Concept Master Plan for the Collier Neighborhood. Public involvement
<br />was a major component of the project scope. Scope was comprised of 4 deliverables: (1)
<br />assessment of existing conditions to include a functional analysis of the area: (2) assessment of
<br />issues and opportunities present that affect the development of the neighborhood: (3) a fist of
<br />recommendations and projects to include cost estiamtes and possible funding sources and (4)
<br />the delivery of the final Colter Neighborhood Development Concept Master Plan Report.
<br />Cba "„r. .._
<br />CONTINUING PROFESSIONAL SERVICES I RFa NO. 14 -07 -02
<br />78
<br />
|