Laserfiche WebLink
I UTILI <br />NATION <br />EFFECTIVE UTILITY COORDINATION PROCESS <br />INITIAL INVESTIGATION PROCESS: <br />COMPLIANCE WITH LOCAL AUTHORITY PROCE- <br />DURES <br />PERMITTING REVIEW <br />NOTIFICATION OF ALL AF FECTED UTILITIES <br />SCHEDULING REVIEW <br />QUALITY CONTROL REVIEW <br />OBTAINING UTILITY AS- BUILTS <br />RESEARCHING GOVERNMENT PERMIT FILES <br />CONDUCTING FIELD REVIEWS DETAILED COORDI- <br />NATION PROCESS <br />DETAILED COORDINATION PROCESS : <br />GROUP UTILITY MEETINGS ACCORDING TO PLAN <br />PHASE <br />PAGE -BY -PAGE PLAN REVIEW AT MEETINGS <br />DETERMINATION OF REIMBURSEMENT TO UTILITIES <br />REVIEW OF UTILITY, RELOCATION PLANS AND ESTI- <br />MATES <br />PROCESSINGIREVIEW AGREEMENTS <br />DESIGN ADJUSTMENTS TO REDUCE UTILITY RELO- <br />CATION AND PROJECT CONSTRUCTION TIME <br />MEETINGS WITH RAILROAD COMPANIES <br />WRITE AND REVIEW UTILITY CONTRACT SPECIAL <br />PROVISIONS <br />CONFLICT ANALYSIS AND DEVELOPMENT OF CON- <br />FLICT MATRIX <br />UTILITY CONS T RUCTABILITY REVIEW <br />ONE -ON -0NE MEETINGS WITH UTILITY OWNERS <br />RECOMMENDATION OF SUE QUALITY LEVELS <br />ASSISTANCE TO CLIENT WITH PROJECT PAPER- <br />WORK <br />REVIEW OF EXISTING PERMITS OR ISSUE NEW PER- <br />MITS FOR <br />PROPOSED RELOCATION WORK <br />MEETINGS WITH ROW AND CONSTRUCTION DE- <br />PARTMENTS <br />UTILITY CONSTRUCTABILITY REVIEW <br />FINAL UTILITY CERTIFICATIONS POST- DESIGN FOL- <br />LOW UP <br />FOLLOW -UP: <br />SHOP DRAWING REVIEWS <br />AS -BUILT REVIEWS <br />CONSTRUCTION MEETINGS <br />CLAIM SETTLEMENT <br />EXPERT WITNESS <br />UTILITY PLACEMENT INSPECTION <br />LANDSURVE\0RS AND MAPPERS <br />3DILASER SCANNING <br />/ UTILIT\C00RDINAT10N <br />l SUBSURFACE UTILITY ENGINEERING <br />MTILITY RELATED CONFLICTS ARE A MAJOR ® esign Build Packages: Design\ ild is one <br />CAUSE OF DELAYS AND CLAIMS DURING area where utility information is often lacking. <br />ROADWAY CONSTRUCTION. Every type of new HADONNE can assist the Department in gathering <br />project, from major reconstruction to minor projects, <br />requires a meticulous awareness of the utility sys- the utility information required for the Design and <br />s <br />term already in place and, all too often, in the way of Construction Criteria Package. The package should <br />proposed improvements. HADONNE delivers a dis- W identify wanting to enter into a Utility <br />Work ork by Highway Contractor (UWHC) Agreement <br />Gott service that focuses on minimizing impacts to <br />utilities, thus reducing project delays. Our Utility <br />Coordination Team is made up of individuals with an <br />extensive knowledge and experience of FDOT, local, <br />county and city government's standards and proce- <br />dures and well as the norms and practices of the <br />Utility Industry. This past experience has given us an <br />inside knowledge of the utility industrys needs and <br />shortfalls and the important role that Utility Coordina- <br />tion plays on the design and construction of FDOT's <br />projects. <br />rtw, Dp ..r«T...y.. <br />2010 UAM <br />UtMry Accommodation f a wl <br />r ,.r <br />Q <br />t a noamamy <br />As Utility Consultants, the HADONNE Team may be and state d the UAOs are eligible for reimbursement <br />called upon to perform various roles that we are fully including a cost estimate of the relocation efforts. This <br />prepared to undertake: information will aid the DBFs in submitting more aocu- <br />upporting Internal Design: We are prepared to rate proposals and minimize or possibly eliminate <br />provide coordination efforts on several internal claims associated with utility relocations. <br />design projects concurrently through the use of multi- roject Development & Environment: During <br />ple teams with our PM oversight. Our extensive and PD &E studies, the conceptual plans are submit - <br />varied experience coupled with our knowledge and ted to the DUO for their preparation of a comprehen- <br />familiarity of the department's policies and proce- sive Utility Assessment Package. Through coordi- <br />dures makes us an ideal candidate to perform in this nation with the UAOs, the Hadonne Team would <br />capacity, deliver to the PD &E Project Manager marked plans <br />upporting Consultant Design: There may be shoving the locations of all existing and proposed <br />times when the District Utility Office (DUO) re- utilities. If UAOs quality for reimbursement, a Utility <br />quires our assistance with utility coordination (when a <br />Cost estimate for relocation is also prepared for each <br />consultant is performing the design). We can utilize alternative under consideration. <br />our knowledge base to aid the DUO in the following —�I <br />le— <br />s <br />way <br />Performing QA/OC on utility documents submitted <br />by consultants. <br />o Assisting the DUO in finalizing internal Utility Doc - <br />umems (for example, assembling Utility Docu- <br />ments for Federal approval on Compensable <br />interest projects). <br />� Attending meetings on behalf of the DUO. <br />o Providing guidance to utility consultants on exist- <br />ing contracts. <br />- 1(305)266 -Ita8 w Jiadonne.aom O IHADONNE <br />