Laserfiche WebLink
Gisela Rey, P.E. <br />Structural Engineer <br />' Royal Naval Dockyard, Bermuda — The project consists of a new pier of 386 x 112 feet including a two -story <br />building, a Ground Transportation Area of 60,500 square feet for new parking and service areas including more <br />than 550 feet of HZ combined seawall, and a two lines bridge of 300 feet length to connect the pier with the <br />' Ground Transportation Area. The project includes the addition of four 175 ton mooring dolphins and two <br />breasting dolphins. Responsible for structural calculations, design and construction document preparation. <br />Onyx Seawall Replacement, Miami, Florida — The project consists of a replacement of more than 200 feet of <br />existing seawall with a new sheetpiling wall for a new high rise building. Responsibilities included design, and <br />construction document preparation. <br />' Cypress Club, Ft Meyers, Florida — The project consists of a private marina for two high rise residential <br />buildings, with 520 feet of sheetpiling seawall and walkways, including breakwaters and piers to accommodate <br />70 boats from 30 to 56 feet length. Responsibilities included structural calculation, design, construction <br />' document preparation and dredging evaluation. <br />Playa Mujeres, Quintana Roo, Mexico — Design of a recreational marina for 170 boats from 46 to 120 feet of <br />length with more than 1,600 feet of sheetpiling wall and two concrete docks for a new restaurant and an <br />' administrative building. Responsibilities included structural calculation, design and construction document <br />preparation. <br />' Miami Circle Seawall Replacement, Miami, Florida — The project consists of a replacement of more than 540 <br />feet of a partially collapsed seawall with a new sheetpiling wall at Archeological Tequesta Circle in Miami River. <br />Responsibilities included design and construction document preparation. <br />Charlottetown Port Improvements, Canada — Analysis and evaluation of the existing port capacity to <br />accommodate the cruise lines industry including recommendations of investments in improvements to the port <br />facility with the installation of four additional mooring dolphins with bollards 150 ton capacity. <br />' Isla Melons Marine Terminal, Balboa, Panama — For the new terminal near the entrance of the Panama <br />Canal the analysis was performed for all berthing structures including the loading platforms for the tanker and <br />barge berths, the breasting dolphins and the mooring dolphins including bollards. <br />' Marassi Marina, Egypt — Design of a recreational marina for 252 boats from 40 to 200 feet of length. <br />Responsibilities included structural calculation, design and construction document preparation. <br />EDUCATION <br />' Bachelor and Master of Science, Structural Engineering, Kiev Institute of Civil Engineering, Ukraine, <br />1981 <br />' Structural Engineering Advanced Graduate -level Studies, Kiev Institute of Civil Engineering, Ukraine, <br />1985. <br />LICENSES <br />1 Professional Engineer, State of Florida, *PE 66366 (Structural Discipline) <br />m M . <br />f: <br />D <br />