My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chisholm Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Chisholm Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:30:13 AM
Creation date
8/18/2014 4:56:11 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
El <br />SUNNY ISLES BEACH PEDESTRIAN BRIDGE PROJECT <br />Firm Name: ,Milian, Swain & Associates. Inc. <br />Client Name: City ofSumry Isles Bench/ <br />Marlin Engineering (Prime) <br />Client Address: 18070 Collins Ave. <br />Sunny Isles Beach, Florida <br />Client Telephone No: (303)477 -7375 <br />Contact Person: Edivin Mojena <br />Type of Service: Site Assessment & Permitting <br />Project Cost: S85.000 <br />Start Date: June 2007 <br />Completion Date: Pebruary 2009 <br />Key Individuals: Arsenio Milian, P.E. <br />The City of Sunny Isles Beach, Florida proposed the construction of a pedestrian bridge <br />over a finder canal on the western (Intracoastal Waterway) side of the city. This was a two - <br />part project consisting of the construction of an emergency vehicle and pedestrian bridge <br />connecting North Bav Road from 174h Street to 172 °d Street; and the second part. the <br />construction of an observation deck in Town Center Park, located at the east end of the <br />canal, and a boardwalk connecting the deck to the North Bay Road bridge. <br />® Milian, Swain K Associates, Inc. (MSA) was hired to conduct environmental assessment <br />and permitting services in support of this bridge installation. The assessment included a <br />wetlands evaluation, mangrove habitat identification, benthic resources inventory, seagrass <br />and bathymetric mapping. <br />MSA's SCUBA divers determined the <br />presence, density and distribution of seagrass, <br />using a combination of Line Intercept and a <br />modified Daubenmirc transect methods. Six,, <br />(6) transects lines were run across the canal. <br />Data was used to measure seagrass in percent <br />cover. The report will be included with the 1 c" _ -77 <br />Class I DER \1 and ERP permit applications. <br />-4 a.�.. <br />_�S_._::� mac-. <br />,. <br />MSA <br />
The URL can be used to link to this page
Your browser does not support the video tag.