Laserfiche WebLink
11 <br />FJ <br />E <br />ARSENIO MILIAN, P.E. <br />President <br />EXPERTISE <br />Mr. Milian has over 40 years of experience in Environmental and Civil Engineering, <br />management, design, oermitting and operation of utility and solid waste systems. <br />Below is a summary of recent major Projects he has worked on. <br />EXPERIENCE <br />Pump Station Nos 862 863 1003 1009 372 108 177 795 and 1233 - Miami. <br />Dade Water and Sewer Department, Florida <br />Principal in Charge - Design of various sanitary sewer pump station upgrade <br />projects for the Miami -Dade Water and Sevier Department (MDWASD). These <br />projects include Jte retrofit of the upgraded pump, station reconfiguration from <br />wet -dry to submersible systems, yard piping modifications, development of the <br />contract cocument's technical specifications, and preparation of engineer's ooinion <br />of probable construction cost. <br />Tree Island Park - Public Right of Way Improvements - Miami-Dade Co. <br />Parks, Recreation and Open Spaces Department ( MDPROS), Florida <br />Principal Engineer for the civil and environmental engineering services provided <br />to MDPROS for the design of roadway improvements within the existing public <br />road rights of way directly adjacent to the Tree Island Park prope try. <br />Treatment - University of Florida- 1968 <br />PROFESSIONAL CERTIFICATION & <br />AFFILIATIONS (past & present) <br />• Florida Professional Engineer No.. <br />13134 <br />• American Waterworks Association <br />• American Society of Civil Engineers <br />• Citizens for a Better South Florida - <br />President <br />• Florida Waterworks Association <br />• Miami River Stormwater Sub - <br />Committee - Chair <br />• National Audubon Society - Board of <br />„-.Directors h <br />�• The;Na16re Con-seriang, Florida, <br />MIA Storm Water Treatment Units - Miami -Dade Aviation Department (MDAD) - Miami -Dade County, Florida <br />Principal in Charge responsible for the Duality control of the design of the Miami International .Airport Storm Water Treatment <br />Units. The units considered included Vortechnics, Storm Ceptor and CDS. Each unit was rankled based on criteria that Miami - <br />Dade Aviation Department (MDAD) considered critical. Control structures were also designed to divert storm water runoff from <br />the drainage collection system into treatment units. Aeration units were designed at two Terminal Area Water Shed outfall <br />locations. <br />Miami River Greenways - Miami -Dade County Public Works, FL <br />Principal in Charge for the civil engineering services provided to the Miami River Greenways project. MSA was responsible for <br />the permitting process of the project which entailed 'the connection of six (6) sites with walkways along the Miami River. <br />Regional Pump Station 177 Improvements - Miami -Dade Water and Sewer Department, Florida <br />Principal Engineer for the services provided to Miami -Dade Water and Sewer Department (MDWASD) for the upgrades to <br />^rumo Station 177, located within the City of South Miami. Work provided included civil design, permitting and construction <br />support services. MSA was also in charge of coordinating and leading the team that performed civil, electrical, structural, <br />geotechnical, surveying and mapping services. <br />FPL - Princeton Substation (Water & Wastewater Engineering) - Florida Power & Light Company (FPL) - Miami, FL <br />Principal in Charge for the civil engineering services provided to FPL for the design, permitting and construction documents for <br />the new Princeton Substation. MSA's scope of services included the development of the design of the construction and <br />permitting plans, and obtaining the governmental approvals and regulatory permits for the site development construction. <br />GSA Facility Design/Build at NW 46th St & NW 35th Ave. - Miami -Dade County, Florida <br />Principal in Charge responsible for overseeing all work related to the design, permitting and construction of the water <br />distribution, sewage collection and storm water management systems required for the new 100,000 square foot GSA facility <br />Water Supply Master Plan- Capital Improvements - Miami -Dade Water and Sewer Department, Florida <br />Project Manager responsible for coordinating all work related to a water supply master plan for Miami -Dade Water and Sewer <br />Department (MDWASD). Coordinated the review of the water demand projections by MDWASD. Directed the preparation of a <br />senior review of the preliminary Capital Improvement Plan (CIP). Assisted in the development of funding options for the CIP. <br />Coordinated the assistance for the development of conclusions and recommendations for the final report. <br />Wastewater Reuse Feasibility Study Update - Miami -Dade Water and Sewer Department - FL <br />Project Manager - Coordinated all work related to the services provided to Miami -Dade Water and Sewer Department for the <br />completion of a Wastewater Reuse Feasibility Study Update. Responsible for reviewing current and proposed regulations and <br />policies from the different pertaining agencies. Assistance with the identification of potential suitable users for reuse. In charge cf <br />coordinating the preparation of an updated reuse feasibility report and responsible for responding to inquiries about the reuse <br />plan proposed. <br />Page 1 of 2 <br />MSA. <br />