Laserfiche WebLink
�a Ardarnan & Associates, Inc. <br />® GeDW04*m, Env.wmemal wO <br />ma c,..' Evelio Horta, Ph.D., P.E. <br />Chief Geotechnical Engineer, Miami <br />Education: Ph.D. Technical Sciences in Soil Mechanics, <br />M.S. in Soil Mechanics, <br />B.S.C.E., <br />Registration: Professional Engineer, Florida, No. 46625 <br />Years Experience: 43 <br />Dr. Horta has over 43 years of varied experience in the field of geotechnical engineering, and has been with Ardaman for the <br />past 17 years. Mr. Horta supervises geotechnical investigations and prepares recommendations for a wide variety of projects <br />including low to high -rise structures, highways and bridges, embankments, dams, and public work projects. He also <br />supervises construction monitoring and testing on similar projects. <br />Relevant Experience: <br />SR 836 -RSRR Westbound to Southbound HRFT Connection, Miami, Florida 2008 -2009 Project Manager: Mr. <br />Scott Dean, HNTB <br />Mr. Horta performed analyses of the central pier foundation settlements. Provided recommendations for underpinning of <br />the foundation based on the results of modeling of the structures using the Plaxis 3D program. <br />® e MIC -MIA Elevated Railroad, Miami International Airport 2002 <br />DAC Project Manager: Mr. Gasser Douge, P.E. <br />Mr. Horta served as Senior Project Engineer for the new elevated railroad connecting the MIA terminals with the new <br />complex of car rental east of LeJeune Road. The geotechnical investigation included deep borings, laboratory testing and <br />studies to provide recommendations for piles and shaft foundation for the new continuous bridge structure and its <br />maintenance facilities. <br />• SR 826 Improvement Program; SR 8261836 Interchange — FDOT, District 6, Miami, Florida 2000 Project Manager: <br />Mr. Ali Togliani, P.E., FDOT <br />Mr. Horta served as Senior Geotechnical Engineer for this interchange which includes 50 bridges on variable soil <br />conditions. The bridges will be separated on shafts and driven piles. The soil investigation includes about 230 borings <br />extended to depths of 125 feet below grade. <br />• North Terminal Expansion Program, Miami International Airport, Miami, Florida 2007 -2009 Project Manager: Mr. <br />Enrique Perez. (Miami -Dade Aviation Department) <br />Ardaman is currently performing all soil testing, foundation inspections, pile installation observations and materials testing <br />for 18 different projects within the scope of the North Terminal Expansion. <br />• South Terminal Expansion Program, Miami International Airport, Miami, Florida 2006 Project Manager: George <br />Garcia, P.E. (Miami International Airport) <br />Mr. Horta served as Senior Geotechnical Engineer for this project which included the design and construction of the new <br />terminal plus the new Concourse J and remodeling of Concourse H. Ardaman performed all soil testing and foundation <br />inspection and testing for the new terminal (J) and remodeled terminal (H). <br />• Sawgrass Expressway Ramp Toll Plaza Improvements (US441 & Lyons Rd - New toll facilities /roadway <br />improvements), Broward County (Bentley Architects + Engineers) <br />Mr. Horta as Senior Geotechnical Engineer for this project which included the geotechnical investigation for the <br />improvements and widening of five ramps connecting the Sawgrass Expressway to US-441 and Lyons Road. Standard <br />-J <br />Page 1 <br />