Laserfiche WebLink
Angelina Fairchild, P.E., LEED AP <br />Transportation Planning/Traffic Engineering <br />ARCOS 1 Fiber Optic Cable Project, Sunny Isles Beach, FL — Project engineer for design <br />and permitting sketches and documents for this project, which brings an offshore cable system <br />into the United States from the Caribbean and South America at Sunny Isles Beach. In order <br />to bring the cables to shore, six offshore conduits were designed from west of the coastal <br />construction control line (CCCL) to approximately 2,000 feet offshore. Two sub - aqueous <br />crossings, one across the Intracoastal Waterway and one across the Oleta River, were <br />designed. A key part of the design is to incorporate construction techniques, and address <br />erosion and turbidity control for state DEP ERP permitting. <br />Continuing Consulting Services, Palm Beach, FL — Performed structural evaluations and <br />made repair recommendations for several existing lift stations under the jurisdiction of the Town <br />of Palm Beach. <br />Veteran's Memorial Foundation - Boynton Beach, FL, Boynton Beach, FL — Served as <br />lead structural engineer for the City of Boynton Beach on a continuing services contract to <br />assist the City in evaluating the overturning stability of a monument selected by the Veterans <br />of America. The initial proposed design did not work and Kimley -Horn collaborated with the <br />monument designer and the City to develop an alternate that would be code compliant and <br />acceptable to the Veterans. <br />Sugar Sand Park Design, Boca Raton, FL — Project engineer for the master plan update <br />and overall project coordination for Phase IV of Sugar Sand Park. The entire Sugar Sand <br />Park consists of 132 acres of passive and active recreation facilities, including a community <br />center with a theatre and science center, field house, baseball/softball fields, in -line hockey <br />rink, science playground, and picnic pavilions. Kimley -Horn assisted the Greater Boca Raton <br />Beach and Park District with the site planning, civil design, landscape design, environmental <br />permitting, and installation of the carousel as part of the overall development of Phase 4 of the <br />park. Opened in November 2005, the carousel had more than 40,000 riders its first month of <br />operation. Our ongoing services for Sugar Sand Park include the design of numerous pavilion <br />facilities, restrooms, and an interactive fountain, as well as modifications to their guard house <br />and entryway for the development of the final phase of the park. <br />Boy Scout Hut Neighborhood Park, Delray Beach, FL — Project engineer on the Kimley - <br />Horn team who completed schematic design services for improvements to the Boy Scout <br />Hut Park in Delray Beach. Improvements included upgrades to the existing parking, drainage <br />improvements, aesthetic improvements to the Boy Scout Hut, addition of new restrooms, a <br />fitness trail, a playground, a decorative perimeter fence, and significant landscaping. Additional <br />services included public outreach meetings, design, and bid phase assistance. <br />Miscellaneous Structures for Parks and Recreation Projects, Jupiter, FL — Provided <br />structural engineering design and quality assurance services for structural elements (dugouts, <br />concession stands, enclosures, etc.) for several park projects for the Town of Jupiter. <br />Lakefront Park Master Plan and Redevelopment Plans, Kissimmee Community <br />Redevelopment Agency (CRA), Kissimmee, FL — Kimley -Horn teamed with Glatting Jackson <br />and finalizing the construction plans for the redevelopment of this city-owned waterfront park <br />on Lake Tohopekaliga. The team prepared the masterplan for this redevelopment in 2008 <br />RM 14L7{ <br />OY2 21.14-0 S=y Isla 3e Oda P,oi S.. Resumes." <br />Special Qualifications <br />• A lead engineer in our Florida <br />region structural division with 26 <br />years of experience <br />• Principal areas of practice <br />include industrial facilities, <br />municipal projects, parks, <br />marinas, bridges, and condition <br />assessments <br />■ Involved in the design, <br />rehabilitation, repair, <br />construction, and inspection <br />phase services on a variety of <br />structural engineering projects <br />that have included conventional <br />reinforced concrete, precast <br />prestressed concrete, post - <br />tensioned concrete, and <br />structural steel <br />■ Recipient of the Florida <br />Engineering Society's 2010 <br />Award for Outstanding Service <br />to the Engineering Profession <br />(statewide and for the FES Palm <br />Beach County branch) <br />Professional Credentials <br />Master of Science, Civil <br />Engineering, University of Texas, <br />Austin <br />Bachelor of Science, Architectural <br />Engineering, University of Texas, <br />Austin <br />Professional Engineer in Florida <br />LEED Accredited Professional <br />Professional Organizations <br />Florida Engineering Society, State <br />V.P. of Finance <br />Florida Engineering Foundation, <br />Board of Trustees <br />U.S. Green Building Council <br />Kimley > >>Hor�n <br />