Laserfiche WebLink
0 <br />0 <br />David Woodward, RLA <br />® <br />f <br />® <br />Landscape Architecture <br />y <br />® <br />Indian River County Administration Complex, Vero Beach, FL — Landscape architect for <br />Special Qualifications <br />the new 165,000- square -foot, 14- department County administration complex situated on 7.60 <br />■ Has 26 years of experience in <br />® <br />acres. Services included relocation of numerous large live oak trees, hardscape design of plaza <br />landscape architecture and land <br />® <br />and pedestrian amenities, and main street design so the street can be closed for an shows and <br />planning <br />® <br />special events. In addition, Kimley -Horn designed the new County access road and bridge over <br />■ Project management <br />the main relief canal from Aviation Boulevard. <br />responsibilities include detailed <br />® <br />® <br />Port St. Lucie Civic Center, Parking Garage, and City Plaza, Port St. Lucie, FL — Project <br />land planning and landscape <br />design for roadway, residential, <br />manager for landscape, hardscape, and irrigation design for the City of Port St. Lucie's <br />multi -use, and corporate sites; <br />® <br />S25- million new civic center located in City Center. Project included design of athree -acre <br />urban and suburban streetscape <br />® <br />urban plaza in front of the civic center consisting of an elaborate brick paver design, outdoor <br />master planning; hardscape <br />® <br />seating and eating areas, vehicular drop -off areas, landscape uplighting and pedestrian lighting, <br />design; landscape construction <br />flag court, lakeside terrace, and selection and location placement of all site furnishings. <br />documents; and construction <br />® <br />® <br />Royal Palm Pointe, Vero Beach, FL — Project manager for this S5.6- million enhancement <br />administration <br />project. Responsibilities included coordinating multiple subconsultants, conducting several public <br />Professional Credentials <br />® <br />consensus workshops, assisting City government in applying for and securing various grants, <br />Bachelor of Landscape <br />® <br />expediting environmental permits, and ultimately producing a comprehensive redevelopment <br />Architecture, University of Florida <br />® <br />plan for the 2,800 -foot corridor. The project included a three -acre urban waterfront park <br />Landscape Architect in Florida <br />consisting of a participatory fountain, park pavilion, multi -level plaza, bulkhead, and pier. <br />and <br />® <br />Royal Palm Pointe was awarded the 2002 ASLA Award of Honor and the American Council of <br />North Carolina <br />® <br />Engineering Companies National Recognition Award for Engineering Excellence in 2002. <br />Professional Organizations <br />® <br />Design Services for The Mary Ann Cernuto Family Park, Port St. Lucie, FL — Project <br />American Society of Landscape <br />® <br />manager. Assisted the City of Port St. Lucie and DeGuardiola Properties with the development <br />Architects <br />of an 0.8 -acre urban plaza within the East Lake Village project. The scope of work included <br />International Council of Shopping <br />® <br />meeting with the City Council members and City staff to develop a project program, conceptual <br />Centers (ICSC) <br />® <br />plans and cost estimates, and presentations to the Community Redevelopment Agency Board. <br />® <br />Our team also provided design and permitting for the project, which included a band pavilion, <br />plaza, public an display, parking, landscape design, site lighting, irrigation, and signage. <br />® <br />Savannas Recreation Area, North and South Trail Greenway Connector, St. Lucie <br />County, FL — Project manager for the Kimley -Horn team retained to research the viability of <br />® <br />developing a trail connecting the Savannas State Preserve, south of Midway Road, to Savanna <br />® <br />Road/Heathcote Botanical Garden. The trail connection consisted of two parts: the northern <br />® <br />trail connector that commences at the north end of the developed section of the park and <br />continues north approximately 9,900 linear feet along the existing canal bank; and the southern <br />® <br />trail connection that commences at the Midway Road entrance and continues west along the <br />Midway Road right -of -way approximately 320 linear feet. The trail then crosses Midway Road to <br />® <br />connect with the Savannas State Preserve. <br />® <br />Entrada Avenue Beautification, St. Lucie County, FL — Project manager working on a <br />® <br />landscape and irrigation project for a .75 -mile section of median between US 1 and Entrada <br />Avenue. This section of roadway is a frontage road serving a predominately residential <br />® <br />neighborhood. The design of this landscape beautification project emphasizes native, low- <br />maintenance landscape material and provides a visual buffer for the residential properties <br />® <br />hwa <br />adjacent to the highway. <br />Kimley> »Horn <br />® <br />a_o,< -0, <br />OYP5 1.14-0 Sumy tares Beat Cc R SeM Resumes <br />3-66 <br />