|
0
<br />0
<br />David Woodward, RLA
<br />®
<br />f
<br />®
<br />Landscape Architecture
<br />y
<br />®
<br />Indian River County Administration Complex, Vero Beach, FL — Landscape architect for
<br />Special Qualifications
<br />the new 165,000- square -foot, 14- department County administration complex situated on 7.60
<br />■ Has 26 years of experience in
<br />®
<br />acres. Services included relocation of numerous large live oak trees, hardscape design of plaza
<br />landscape architecture and land
<br />®
<br />and pedestrian amenities, and main street design so the street can be closed for an shows and
<br />planning
<br />®
<br />special events. In addition, Kimley -Horn designed the new County access road and bridge over
<br />■ Project management
<br />the main relief canal from Aviation Boulevard.
<br />responsibilities include detailed
<br />®
<br />®
<br />Port St. Lucie Civic Center, Parking Garage, and City Plaza, Port St. Lucie, FL — Project
<br />land planning and landscape
<br />design for roadway, residential,
<br />manager for landscape, hardscape, and irrigation design for the City of Port St. Lucie's
<br />multi -use, and corporate sites;
<br />®
<br />S25- million new civic center located in City Center. Project included design of athree -acre
<br />urban and suburban streetscape
<br />®
<br />urban plaza in front of the civic center consisting of an elaborate brick paver design, outdoor
<br />master planning; hardscape
<br />®
<br />seating and eating areas, vehicular drop -off areas, landscape uplighting and pedestrian lighting,
<br />design; landscape construction
<br />flag court, lakeside terrace, and selection and location placement of all site furnishings.
<br />documents; and construction
<br />®
<br />®
<br />Royal Palm Pointe, Vero Beach, FL — Project manager for this S5.6- million enhancement
<br />administration
<br />project. Responsibilities included coordinating multiple subconsultants, conducting several public
<br />Professional Credentials
<br />®
<br />consensus workshops, assisting City government in applying for and securing various grants,
<br />Bachelor of Landscape
<br />®
<br />expediting environmental permits, and ultimately producing a comprehensive redevelopment
<br />Architecture, University of Florida
<br />®
<br />plan for the 2,800 -foot corridor. The project included a three -acre urban waterfront park
<br />Landscape Architect in Florida
<br />consisting of a participatory fountain, park pavilion, multi -level plaza, bulkhead, and pier.
<br />and
<br />®
<br />Royal Palm Pointe was awarded the 2002 ASLA Award of Honor and the American Council of
<br />North Carolina
<br />®
<br />Engineering Companies National Recognition Award for Engineering Excellence in 2002.
<br />Professional Organizations
<br />®
<br />Design Services for The Mary Ann Cernuto Family Park, Port St. Lucie, FL — Project
<br />American Society of Landscape
<br />®
<br />manager. Assisted the City of Port St. Lucie and DeGuardiola Properties with the development
<br />Architects
<br />of an 0.8 -acre urban plaza within the East Lake Village project. The scope of work included
<br />International Council of Shopping
<br />®
<br />meeting with the City Council members and City staff to develop a project program, conceptual
<br />Centers (ICSC)
<br />®
<br />plans and cost estimates, and presentations to the Community Redevelopment Agency Board.
<br />®
<br />Our team also provided design and permitting for the project, which included a band pavilion,
<br />plaza, public an display, parking, landscape design, site lighting, irrigation, and signage.
<br />®
<br />Savannas Recreation Area, North and South Trail Greenway Connector, St. Lucie
<br />County, FL — Project manager for the Kimley -Horn team retained to research the viability of
<br />®
<br />developing a trail connecting the Savannas State Preserve, south of Midway Road, to Savanna
<br />®
<br />Road/Heathcote Botanical Garden. The trail connection consisted of two parts: the northern
<br />®
<br />trail connector that commences at the north end of the developed section of the park and
<br />continues north approximately 9,900 linear feet along the existing canal bank; and the southern
<br />®
<br />trail connection that commences at the Midway Road entrance and continues west along the
<br />Midway Road right -of -way approximately 320 linear feet. The trail then crosses Midway Road to
<br />®
<br />connect with the Savannas State Preserve.
<br />®
<br />Entrada Avenue Beautification, St. Lucie County, FL — Project manager working on a
<br />®
<br />landscape and irrigation project for a .75 -mile section of median between US 1 and Entrada
<br />Avenue. This section of roadway is a frontage road serving a predominately residential
<br />®
<br />neighborhood. The design of this landscape beautification project emphasizes native, low-
<br />maintenance landscape material and provides a visual buffer for the residential properties
<br />®
<br />hwa
<br />adjacent to the highway.
<br />Kimley> »Horn
<br />®
<br />a_o,< -0,
<br />OYP5 1.14-0 Sumy tares Beat Cc R SeM Resumes
<br />3-66
<br />
|