Laserfiche WebLink
® Relevant Experience, cont. David Woodward, R LA <br />® Monterey Road Design, Stuart, FL — Landscape architect on the Kimley -Horn team contracted by Martin County to expedite the <br />® design of approximately 1.5 miles of Monterey Road (SR 714). The improvement entailed designing a four -lane roadway that would <br />® be consistent with the approved PD &E study conducted by the FDOT that was accepted by the Martin County Metropolitan Planning <br />® Organization. The nature of the work included roadway design, storm sewer design retention calculations, offsite drainage, coordination <br />with the Martin County Airport Authority, landscaping design, and lighting design. <br />® Participatory Fountain at Indian Riverside Park, Jensen Beach, FL — Project manager and landscape architect for this <br />participatory fountain project. Kimley -Horn provided schematic design, civil and landscape architectural design, construction <br />® documentation, permitting, and management services. The firm was also responsible for coordination with the citizens art advisory <br />® board and various subconsultants. <br />® SR 5 /US 1 Improvements, St. Lucie County, FDOT District Four — Provided landscape architectural services for four miles of SR 51 <br />® US 1 in St. Lucie County. Design included mass plantings along the roadsides and median. Special consideration was given to slope <br />® stabilization during design due to coastal sand ridge conditions. <br />® St. Lucie County Fire Stations, St. Lucie County, FL — Landscape architect for three new fire stations for St. Lucie County Fire <br />® District. Services included tree preservation assessments, landscape and irrigation plans, and construction observation. <br />® Juan Ponce de Leon Landing Park, Melbourne Beach, FL — Project manager. Kimley -Horn has worked with Brevard County Parks <br />® and Recreation since 2000. Ponce Landing Park is one of five parks that we designed and permitted. Ponce Landing included all site <br />civil design and permitting, including coastal construction control line (CCCL) permitting; site plan approval; Florida Department of <br />® Environmental Protection water, sewer, and stormwater permitting; and Florida Department of Transportation permitting. Environmental <br />® services included detailed evaluations of the beach and dune system, detailed coordination on lighting impacts, extensive coordination <br />® for dune restoration with the State and with Brevard County Natural Resources Management Office, and identification of appropriate <br />vegetation to restore areas impacted by pedestrian paths along the dune. Kimley -Horn prepared all engineering drawings for <br />® construction, including landscape, utilities, parking, pavilions, restrooms, and dune crossovers. <br />® Oars and Paddles Park, Indian Harbour Beach, FL — Project manager for the Kimley -Horn team that worked with the Brevard <br />® County Parks and Recreation Department to provide the following services for the Oars and Paddles Park: conceptual site planning, <br />® landscape architecture, civil engineering design and permitting, community involvement, dock design and permitting, traffic analysis <br />® and permitting, environmental permitting, environmental services, shoreline stabilization/restoration design, drainage, and construction <br />observation. This park features restrooms, paved walkways, a pavilion, boathouse, floating dock, nature trail, and parking. <br />® Ancient Oaks Park, St. Lucie County, FL — Project manager for this 25 -acre park in central St. Lucie County. The project scope <br />® included design and permitting for a multipurpose playing field, playground, restroom facility, and adjacent nature area. The property <br />® had a number of large oak trees and the park was designed to preserve them. Special details were developed for the vehicular areas to <br />® minimize disturbance to root zones. <br />® Oxbow Eco- Center Expansion, St. Lucie County, FL — Landscape architect and planner to develop design plans for the addition of <br />® 80 parking spaces to the eco- center due to building expansion. Special care was taken to preserve the character of the existing pine <br />flatwood eco- system. Provided circulation and tree protection details. <br />® St. Lucie Historical Museum, Fort Pierce, FL — Project planner and landscape architect for this 4.5 -acre waterfront property. Scope <br />of work included design and permitting for an 80 -car parking lot with bus drop -off area to historical museum, drop -off area for dock <br />® facility, pedestrian connections to riverfront promenade and neighboring park facility, landscaping, irrigation, and site lighting design. <br />IND <br />IND <br />ID <br />QD <br />SR 80 Design from West of Haverhill Road to East of 1.95, West Palm Beach, FL — Provided all landscape architectural design <br />for 3.5 miles of SR 80 from west of Haverhill Road to east of 1 -95. The project included widening this section from four to eight lanes, <br />designing two grade- separated interchanges at Military Trail and Haverhill Road, widening one bridge, replacing four road bridges <br />(including an 1 -95 overpass), and the incorporation of extensive landscape medians. Palm Beach County is the maintaining agency for <br />the landscape and irrigation for this project and Southern Boulevard was part of the County's OTIS (Only Trees, Irrigation, and Sod) <br />master plan program. Kimley -Horn worked closely with the County to establish the native tree palette and the specifying of a remotely - <br />controlled irrigation system. The landscape and irrigation portion of this project included permitting through FDOT, South Florida Water <br />Management District, and Palm Beach County. <br />UO 14 -07� <br />OY25002 1. 14-0 ScaryIsles Seam Cd Pad ServicesFaU:es.vtlG <br />Kimley» )Horn <br />