My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley Horn
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Kimley Horn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:57:02 AM
Creation date
8/19/2014 10:59:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />Architectural, Landscape Architectural, <br />Engineering and Land Surveying Firms Only (CCNA) <br />® SW 146th Street Roadway and Drainage Improvement Project. As the Village's third large Capital Improvement Project, <br />Kimley -Horn assisted in developing a roadway restoration/resurfacing and drainage improvements project in a residential <br />® area including permitting, striping, and site restoration. Our team located proposed drainage infrastructure and provided <br />® cost - effective drainage improvements to meet stormwater management and environmental permitting requirements as well <br />® as minimize impacts to adjacent properties. Kimley -Horn provided construction phase services to expedite the project and <br />to confirm the project was built in accordance with the design plans. Close coordination with residential property owners was <br />® required for this successful project. <br />0 <br />Continuing Stormwater Services, Cutler Bay, FL <br />Kimley -Horn developed a stormwater master plan to address flood protection activities for its residents and to protect the <br />environmental quality of its canals. Kimley -Horn also developed a stormwater management report to assist the Town in creating a <br />stormwater utility, which generates a dedicated stream of revenue to implement capital improvements and maintain an operation <br />and maintenance program associated with the stormwater system. Kimley -Horn also developed the stormwater utility fee <br />methodology and established the range of rates for the utility to implement improvements. The project tasks included compiling <br />data, developing a stormwater master plan, developing a stormwater management report, and assisting the Town in joining the <br />National Flood Insurance Program (NFIP) so the community has future access to federally- funded flood insurance. <br />City of Homestead Community Redevelopment Consulting Services, Homestead, FL <br />Kimley -Horn is working closely with the City of Homestead and the <br />community with the hope that their work will be a catalyst for <br />redevelopment in the area. The SW 4th Street neighborhood has <br />traditionally been a minority community. The project was the site of <br />what was once a bustling business district that included a great <br />mixture of restaurants, jazz clubs, churches, etc. The residents want <br />this area to be restored to its former glory. The first step in this plan <br />is to revitalize a six -block area. A team from Kimley -Horn worked <br />with the community to learn about the issues and concerns such <br />as drainage problems, which contribute to flooding, broken <br />sidewalks, safety concerns, and increased parking needs. We are <br />redesigning the curb and gutter system to make it more efficient at <br />handling runoff, thereby reducing problems with flooding. The City <br />Commission and CRA Board have now adopted the <br />comprehensive plan amendments and Neighborhood Plan <br />implementing the form -based code provisions. Kimley -Horn has <br />also developed a 24 -page desk reference in five -inch by eight -inch <br />format and conducted a one -day training session to prepare City <br />and CRA staff for implementation of the code. Three projects have <br />been submitted and will be the first to be constructed within the <br />neighborhood under the new development standards. <br />OY2Yi021.1 =-0 SRry Isles Bexli C=LrJg Rao s WW semce ,. <br />I i R <br />gz <br />= r~� <br />OY2Yi021.1 =-0 SRry Isles Bexli C=LrJg Rao s WW semce ,. <br />NE 2nd Avenue Reconstruction from NE 91st Street to NE 105th Street, <br />Miami, FL <br />Kimley -Horn developed vertical and horizontal alignments and streetscape and <br />landscape plans, providing drainage design, signing and pavement markings, <br />and signalization plans for a portion of the NE 2nd Avenue corridor. The project <br />included the reconstruction/widening of NE 2nd Avenue from NE 94th Street to <br />NE 103rd Street and areas of roadway milling and resurfacing at the beginning <br />and end of the project. The project included a joint participation agreement with <br />the Village of Miami Shores in which streetscape and landscape improvements <br />were designed with the Village, who funded these improvements. <br />Kimley> »Horn <br />I i R <br />NE 2nd Avenue Reconstruction from NE 91st Street to NE 105th Street, <br />Miami, FL <br />Kimley -Horn developed vertical and horizontal alignments and streetscape and <br />landscape plans, providing drainage design, signing and pavement markings, <br />and signalization plans for a portion of the NE 2nd Avenue corridor. The project <br />included the reconstruction/widening of NE 2nd Avenue from NE 94th Street to <br />NE 103rd Street and areas of roadway milling and resurfacing at the beginning <br />and end of the project. The project included a joint participation agreement with <br />the Village of Miami Shores in which streetscape and landscape improvements <br />were designed with the Village, who funded these improvements. <br />Kimley> »Horn <br />
The URL can be used to link to this page
Your browser does not support the video tag.