Laserfiche WebLink
e <br />Relevant Experience, cont. Stefano Viola, P.E. <br />Miami Lakeway North Resurfacing and Drainage Improvements, A Federally- Funded Design -Build Project, Miami Lakes, FL <br />® Served as project engineer and provided drainage design and utility coordination. Kimley -Horn helped the Town obtain more than <br />• S600,000 in stimulus funding to construct this roadway and drainage improvement project that includes a portion of Miami Lakeway <br />North between Celebration Point and Miami Lakes Drive and NW 153rd Street from Miami Lakeway North to NW 60th Avenue. The <br />project included drainage system improvements such as new stormwater inlets, a new ouffall connection, exfiltration trench for water <br />® quantity and quality treatment, new sidewalk, and new pavement markings and signage. Kimley -Horn also provided construction phase <br />® services to expedite the project and to confirm that the project was built in compliance with the design criteria. <br />General On -Call Traffic Engineering Services, Fort Lauderdale, FL — Project analyst for general traffic engineering and <br />transportation planning services as part of an on -call contract with the City. Kimley -Horn serves as an extension of the City of Fort <br />Lauderdale staff reviewing traffic impact studies and parking analyses. Projects to date have included peer review of traffic impact and <br />parking studies, site plan review, and representation at public hearings. Additional projects have included development of a corridor <br />study to support lane reductions along SR At and development of a Greenways Plan to complement multimodal transportation <br />options within the corridor. <br />Royal Palm Boulevard Improvements, Margate, FL — Analyst for this project that involves realignment of the roadway, east- and <br />westbound left turn lanes, access management modifications, renovation of an existing bridge and medians, construction of pedestrian <br />bridges, base enhancements, milling and resurfacing, providing new asphalt areas, swale improvements, drainage improvements, <br />landscaping, irrigation, and lighting improvements. The work will include design of a roadway bridge and two pedestrian bridges, <br />roadway and turn lanes, drainage, signing and pavement markings, government agency approvals, coordinating with utility providers <br />for adjustments and or relocations, preparing detailed quantity calculations and engineers estimates of probable costs, and providing <br />resident project representation and incidental items. <br />Bid Pack 4 Water Main and Force Main Replacement, Oakland Park, FL — Kimley -Horn provided professional services for the <br />preparation of construction documents and associated permits for the replacement of more than 27,000 linear feet of water main and <br />force main in the City of Oakland Park, Florida. The project consists of replacing existing water mains that have been identified as <br />being substandard with respect to system pressures during fire flow. Services and meter boxes will be replaced to the property line on <br />new water line installations and fire hydrants will be installed in residential and commercial areas. As part of this project, select portions <br />of force main will be upsized within the City and will include the aerial crossing of the C -13 Canal closest to NW 31st Avenue. A critical <br />function of this project is developing a route through the neighboring City of Lauderdale Lakes to provide the most efficient path for <br />looping of the water main. In addition the work must be planned to minimize disruptions to the City during construction. <br />® Vizcaya Park (formerly known as Bluegrass Lakes Park), Miramar, FL — Served as analyst responsible for preparing drainage <br />O and fire flow calculations for this park project that included a playground, three baseball fields, a soccer field, two basketball courts, a <br />community center, and an associated parking lot. <br />® <br />TO Bank (formerly Commerce Bank), Miami -Dade, Broward, and Palm Beach Counties, FL — Served as analyst responsible for <br />preparing engineering permit submittals, construction plans, and drainage calculations for various Commerce Bank locations within <br />® Broward and Palm Beach counties. <br />24 -inch Water Main Route Evaluation Report and Design, West Palm Beach, FL — Served as project engineer. Also provided <br />utility coordination. As a result of the Florida Department of Transportation (FDOT) relocating the Flagler Memorial Bridge, the City of <br />West Palm Beach was required to relocate an existing subaqueous 24 -inch water main that conflicted with the new bridge location. To <br />implement the most beneficial relocation route for the City, Kimley -Horn developed a water main route evaluation report. The project <br />included evaluating four alternative water main alignments to cross the Intracoastal Waterway from the City of West Palm Beach to the <br />Town of Palm Beach. The report discussed community impacts, constructability, permit feasibility, and a recommendation to proceed <br />with a preferred water main route. <br />.VQ14 -07� Kimley> »Horn <br />oy250�21.14p &=. lu' s 5e Cr, ?,oi Seevices Pear S- p 3-22 <br />