Laserfiche WebLink
accompanying GIS shape files of <br />over 300 Everglades tree islands in <br />Water Conservation Areas (WCAs) <br />3A and 3B including elevation, <br />vegetation, and environmental <br />parameters. <br />Broward County Aviation Department <br />(BCAD) Fort Lauderdale - Hollywood <br />International Airport South Runway <br />Project <br />Miller Legg is the lead professional <br />for environmental permitting and for <br />determining sustainability strategies <br />viable for implementation on the <br />new South Runway project. The role <br />of the firm also includes tracking <br />of all other site permits including <br />stormwater, utility, FEC and roadway <br />permits. Extensive permitting agency <br />coordination is required due to <br />mangrove other wetland impacts <br />as well as the lead on burrowing <br />owl obsertvation. Digital maps, <br />using ArcView was created utilizing <br />GPS location data of burrowing <br />owl nests. Proposed construction <br />activity location data CAD files and <br />tiff. Images were georeferenced as <br />a layer on the digital maps cre4ated <br />to determine possible impacts to <br />owl burrows found with construction <br />areas.. <br />Everglades Tree Islands & Big Cypress <br />Invasive Exotic Vegetation Surveys <br />This project involved the survey <br />and documentation of invasive <br />exotic species on Everglades tree <br />islands in Water Conservation Area <br />3A, 36 and Big Cypress. Mr. Mohler <br />provided airboat piloting and <br />navigation and also assisted with <br />the data collection. In addition, this <br />project had a GIS component which <br />required creating polygons and <br />calculating area using Arc Toolbox. <br />FAU Tree Island Elevation Study <br />Through a contract with the SFWMD <br />Tree Island and surrounding slough <br />elevation data was collected on <br />over 200 islands throughout Water <br />Conservation Area 3A and 3B. The <br />information obtained through this <br />project was used to create a GIS <br />model that could determine the <br />amount of dry area on a particular <br />island during different hydrological <br />City of Sunny Isles Beach <br />Continuing ?rofessional Services (or e'ngineenng <br />RFa No. I s -07 -02 <br />AugVS; 12, 2014 <br />periods. Mr. Mohler provided <br />airboat piloting and navigation for <br />this effort, as well as participating in <br />the data collection. <br />City of Fort Lauderdale Executive <br />Airport (FXE) Parcels B, C & D <br />Permitting <br />Miller Legg has been actively <br />involved in the review of the <br />undeveloped but permitted sites for <br />Parcels B, C, and D. Furthermore, <br />our involvement in review of the <br />permits and subsequent proposals <br />to potentially modify or alter the <br />permits, allows us to know how the <br />drainage characteristics may be <br />affected. We also actively monitor <br />pending rule changes from federal <br />and state agencies, relating to <br />water quality treatment, that could <br />affect or modify future development <br />plans as the drainage or treatment <br />requirements will be changing. <br />Miller Legg has worked closely with <br />FXE Airport Management on the <br />review and development order <br />conditions and permit restrictions <br />associated with these undeveloped <br />and permitted parcels. <br />Pembroke Pines City Center <br />This project consisted of <br />approximately 100 acre mixed use <br />project that was the last phase <br />of a 200 acre total development <br />in Pembroke Pines, FL. The City <br />Center project consisted of design <br />for a commercial and town center <br />concept with adjacent multifamily <br />residential components. Unique <br />site design components included <br />incorporation of a city park, linear <br />200' wide FP &L easement that <br />split the property, an adjacent <br />fuel pipeline easement, as well <br />as extensive accommodation for <br />stormwater management systems <br />and wetlands mitigation areas. <br />Services included environmental <br />resource permitting, mitigation <br />design, mitigation construction, <br />maintenance observation, remedial <br />plan development, mitigation <br />monitoring and surveying. <br />C11�51M1iA -.. <br />