Uninterrupted Service during <br />Construction <br />To allow for the least amount of community <br />disruption, early planning of the sequence <br />of construction, and emergency plans <br />for existing utility damage /failures due to <br />construction activities will ensure water and <br />sewer service throughout construction. <br />Regulatory Permitting <br />Early scoping meetings with agencies to <br />define permit requirements and schedule <br />for prompt submittal and approvals - such <br />as FDOT, SFWMD, MDPWD, FDEP, DERM, <br />and municipalities; this includes identifying <br />special construction activity limitations for <br />installing pump stations, stormwater systems <br />and pipelines under major roadways, and <br />traffic management. <br />Design and Construction Bid <br />Documents <br />Simplified value engineering analysis of the <br />project and possible alternatives; Preparing <br />plans and specifications in accordance <br />with City standards; Opinion of probable <br />construction costs based on historical bid <br />data; and finalizing and submitting permit <br />applications on behalf of the City based <br />City of Sunny Isles Beach <br />Coniinuing Professional Services for c "ngineenng <br />R, -"Q No. 1 = -07 -02 <br />August 12. 20 14 <br />on our experience with similar projects, and <br />given the general scope of work defined in <br />the RFQ, we envision the following three - <br />phased approach to the Project (Phase I - <br />Pre- Design; Phase II - Design; Phase III - Post - <br />Design) consisting of the tasks delineated <br />below. We welcome the opportunity to <br />further discuss and refine these tasks once <br />selected. <br />Phase I: Pre - Design <br />The Team will work closely with City staff to <br />develop the general alignment or location <br />for the Projects; identify possible easement <br />acquisitions, and evaluate connection <br />point alternatives with the least disruption <br />to system operation. Based on the general <br />alignment, the CES Team will perform the <br />following: <br />Collect and Review Available <br />Documents <br />We will collect as -built utility maps for major <br />facilities and will plot the utility information <br />to define potential conflicts and to aid in <br />the selection of alternative alignments. <br />Conduct Field Reconnaissance <br />We will make site visits in order to prepare the <br />preliminary technical approach provided <br />44 <br />