Laserfiche WebLink
Phase III — Conceptual Design Services <br />• Based upon the City's response to the presentation element, CPH will prepare design concepts for <br />the proposed project. <br />• Based on the City's comments and input from any required public meetings, CPH will prepare a final <br />conceptual plan for acceptance by the City. <br />Phase IV — Design Development <br />• Based on the approved conceptual design, CPH will prepare project drawings and documents that <br />will be approximately 60% complete. Drawings will be as required by the project type and may <br />include, architectural, structural, civil, mechanical, electrical, plumbing, and /or landscape packages. <br />CPH will compile a Project Status Report, based on the accomplishments of the preliminary services. <br />The drawings will be submitted to the City for review and comment. <br />• When appropriate to the project, CPH will prepare a drawing indicating soil boring locations for <br />geotechnical testing. This information will be submitted with the preliminary plan for review and <br />authorization to proceed with geotechnical testing. <br />• CPH will customize construction cost- estimating documents for the project and will prepare a <br />preliminary cost estimate. The cost documents will be used throughout the project to monitor <br />construction cost and to attach costs to various alternatives. <br />• CPH will meet with the necessary regulatory agencies and conduct a "pre- submittal" presentation. <br />The project alternatives will be presented and we will gain knowledge of the agencies' concerns and <br />expectations. <br />• CPH will prepare and submit a preliminary technical specifications package based on the 60% <br />package. <br />Phase V — Construction Documents Services <br />• CPH will incorporate comments obtained from the City's review, the public involvement process, our <br />internal review and regulatory agencies into the project design to finalize the construction drawings. <br />• CPH will refine the design and the Project Status Report will be revised to include progress of the <br />project and delineate issues of concern, and decisions that need to be made. <br />• The cost estimate will be updated and revised to reflect changes to the plan. <br />• A permitting package will be prepared and sent to all of the regulatory agencies. Meetings will be <br />conducted with the regulatory agencies and their comments will be addressed and incorporated <br />into the drawings. <br />• 90% construction drawings, specifications and cost estimate, will be submitted to the City for a <br />second review. <br />• Upon approval of the 90% per construction documents and receipt of the comments from the City, <br />the public, our internal review and the regulatory agencies, the 100% construction documents will <br />be finalized and submitted to the City for bidding. <br />• The cost estimate will be updated based on unit price bid quantities. <br />Phase VI — Bidding Services <br />• CPH will assist the City in preparing bid advertisements and packages. <br />• CPH will provide the City with the interpretation of the intent of the construction documents <br />throughout the bidding process. All responses to questions will be recorded in writing and <br />distributed to the City and prospective bidders. <br />• During the bid process, if requested by the City, a pre -bid meeting will be conducted with <br />prospective bidders to receive questions and comments. CPH will respond to all questions and <br />comments in writing via the issuance of an addendum. <br />• CPH will revise the bid documents and prepare bid addenda as required. <br />43 CPH, Inc. /RFQ No. 14 -07 -02 <br />