My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Continuing Professional Services for Architectural, Landscape Architectural, <br />Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 <br />The key to our success in providing contract administration services includes: <br />• Proper interpretation of the construction bid documents, <br />• Maintaining detailed documentation throughout the construction, <br />• Documenting change orders and quantity revisions, <br />• Documenting changes in field conditions, and <br />• Being responsive. <br />RJ Behar has provided construction inspection services under continuous basis contracts to the Cities of <br />Lauderdale Lakes, Fort Lauderdale, Coral Springs, Hialeah, Palm Beach County and the South Florida Water <br />Management District. Recent projects include: <br />• Wal -Mart Super Center, City of Lauderdale Lakes <br />• N. W. 44m Street Improvements, City of Lauderdale Lakes <br />• NW 97m Avenue Construction Management, City of Hialeah <br />• Citywide Swale Restoration Project, City of Lauderdale Lakes <br />• Super Wal -Mart Inspections, City of Lauderdale Lakes <br />• C-4 Canal Restoration, SFWMD <br />• C -100 and C -2 Bank Restoration, SFWMD <br />• S20F Wing Wall Repairs, SFWMD <br />• Deering Estates Flow -Way, Palmetto Bay, SFWMD <br />• Inspection of the S -310 Lock Structure Rehabilitation, SFWMD <br />• Citywide Resurfacing Inspection, City of Coral Springs <br />• N. W. 431d Avenue /City Hall Parking Lot, City of Lauderdale Lakes <br />• N.E. 331d Avenue -Neighborhood Improvements City of Fort Lauderdale <br />RJ Behar has provided full construction management services for numerous projects for municipalities, South <br />Florida Water Management, and the Florida Department of Transportation. We are well aware of the duties need <br />to fulfill a CEI scope, which include attending preconstruction meeting(s); reviewing and processing payment <br />applications, approving schedule of values; monitoring and tracking the contractor's work progress and schedule; <br />requesting and reviewing schedule modifications to ensure the contractor maximized time and resources; <br />maintaining and accurately monitoring logs (correspondence, submittals/ shop drawings, RFI's, change orders, <br />deficiency reports, payment applications); responding to contractor RFI's in a timely manner, conducting and <br />coordinating the technical review and return of contractor submittals in a timely manner; coordinating and <br />monitoring inspection procedures and making site visits as necessary to accomplish same; assisting/coordinating <br />with Utilities (BellSouth, FP &L, cable, etc.) and City Departments as <br />required; attending neighborhood meetings and /or City Commission <br />meetings as requested; determining the need for any change orders, <br />providing summary and justification for change as well as cost1 G <br />estimates; assisting in negotiations with the contractor; conducting - T e <br />weekly/bi- weekly meetings to evaluate the contractor's progress andt r , <br />to resolve issues; preparing and distributing meeting minutes; "= <br />Ott o .• t v1 -` <br />overseeing substantial and final inspections, preparing and tracking <br />punch list items; reviewing and processing record drawings; and <br />preparing certifications and dose -out permits. <br />J' I <br />RFQ No. 14 -07 -02 1 Page 12.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.