My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EA <br />11 <br />I:] <br />J. <br />CLIENT: <br />Miami -Dade County <br />Metropolitan Planning Organization <br />(MPO) <br />Subconsultantto: <br />Kimley -Horn & Associates, Inc. <br />5200 NW 33d Avenue, Suite 109 <br />Fort Lauderdale, FL 33309 <br />Gregory Kyle, AICP <br />Tel: (954) 739 -2233 <br />Email: greg.kyle@kimley-horn.com <br />RJ BEHAR'S ROLE: <br />Traffic Evaluations <br />PROJECT STARTED: 0112512012 <br />PROJECT COMPLETED: 0713112012 <br />COST /FEES PAID: 88,817.00 <br />CONSTRUCTION COST: N/A <br />CHANGE ORDERS: None <br />TIME EXTENSIONS: None <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J Behar, PE <br />Principal in Charge <br />Rafael De Arazoza, PE, PTOE <br />Task Manager <br />Dima Poe, El <br />Project Engineer <br />Mariana Urdaneta <br />Data Collection <br />This project consists of the Development of Truck Parking Facilities in <br />Miami -Dade Countv. <br />R.J. Behar & Companv. Inc is providing the services indicated below <br />for the subject study. <br />1. Beacon Lakes Development of Regional Impact (BL DRI) <br />Access Connections to Roadway Network and Future Traffic <br />Volumes. <br />2. Drainage: Determine general retention/detention pond areas <br />or exfiltration trench needs for a 5 acre, 10 acre, and 40 acre <br />site. <br />R.J.Behar & Company, Inc. <br />f l ' E n g i n e e r s • P l a n n e r s <br />RFQ No. 14 -07 -02 1 Page 12.47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.