My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(A <br />J. <br />II <br />�J <br />Florida Department of <br />Transportation, District 6 <br />1000 N. W. 111 Street <br />Miami, FL 33171 <br />Mr. Danny Iglesias, PE <br />Project Manager <br />Tel: (305) 470 -5289 <br />Fax: (305) 470 -6715 <br />donne. idesiosndot. scat e. fl. us <br />RJ BEHAR'S ROLE: <br />Milling, resurfacing, pedestrian <br />curb, signing and pavement <br />markings, traffic control plans, ADA <br />and pedestrian upgrades, as well as <br />bicycle lane consideration. <br />® PROJECT STARTED: 211012011 <br />PROJECT COMPLETED: 0612014 <br />Cost /FEES PAID: 8589,876 <br />CONST. COST: 53,416,423.00 Est. <br />PROJECT LENGTH: 1.91 Miles <br />FPID #:419190- 1 -52 -01 & <br />419190- 1 -52 -01 <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J. Behar, PE <br />Principal in Charge <br />Javier Rodriguez, PE <br />Project Manager <br />Andrea Virgin, PE, LEED AP <br />Project Engineer <br />Yulet Miguel, PE <br />Project Engineer <br />Rohan Punit, EI <br />Project Engineer <br />Nanette Akvaz <br />Project Designer <br />11 <br />The project corridor is composed of approximately 1. 96 miles of Urban - <br />Section, 6 -lane divided principal arterial along SR -5 1Biscayne Boulevard <br />between NE 111" Street and north of NE 151' Street. The corridor is <br />located in the Cities of North Miami and North Miami Beach. <br />The scope of services included milling and resurfacing, pedestrian curb <br />ramps upgrading to comply with ADA requirements, signing and <br />pavement markings, and bike lane designations, and traffic control plans. <br />The project access management analysis resulted in the closure of several <br />unnecessary driveways. Enhanced traffic signal signage was required <br />due to a high rate of accidents at the corridor's one signalized <br />intersection. Additionally, the Typical Section was modified to <br />accommodate bicycle lanes without widening. <br />R.I.Behar & Company, Inc. <br />II�t�Tll Engineers • Planner s <br />RFQ No. 14 -07 -02 1 Page 12.48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.