My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
El <br />J. <br />CLIENT <br />City of Pembroke Pines <br />10100 Pines Boulevard <br />Pembroke Pines, FL 33026 <br />Mr. Charles F Dodge <br />City Manager <br />Tel: (954) 431 -4884 <br />Email: cdodge@ppines.com <br />RJ BEHAR'S ROLE: <br />Design, permitting, constr <br />pavement design, environmental <br />(including wetland impacts <br />mitigation) drainage r <br />earthwork1geotechnical reco <br />dations, and utility coordination <br />Subconsuliants: <br />Metric Engineering, Inc. <br />(Environmental/Wetland Mitigation) <br />Vertical V- Southeast, Inc. <br />(Geotechnical/Tesiing) <br />Craven Thompson & Associates, Inc. <br />(Surveying) <br />Chen Moore and Associates <br />(Utility Coordination) <br />PROJECT STARTED: 612212012 <br />PROJECT COMPLETED (DESIGN): <br />07/2013 <br />CONST. PROJECT COMPLETED: <br />Ongoing <br />COST /FEES PAID: $756,505.00 <br />CONST. COST: $5.3 Million <br />PROJECT LENGTH: 2 miles (Approx) <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J Behar, PE <br />Principal in Charge <br />Javier Rodriguez, PE <br />Project Manager <br />Andrea Virgin, PE, LEED AP <br />Roadway Design <br />Yulei Miguel, PE <br />Project Engineer <br />Marlin Scattolini, EI <br />® Roadway Design <br />This is a Design /Build project for SW 196" Avenue (from Pembroke Road <br />to Pines Boulevard) and Pembroke Road (from ArW 196'" Avenue to SW <br />184'" Avenue). <br />The scope of this project consists of designing a 2 mile rural section <br />collector and arterial. The project includes roadway design, complex <br />drainage including the design of twin 72" culverts, permitting, wetland <br />mitigation, extensive earthwork with the use of Geogrid to avoid extensive <br />demucking, and utility coordination. RJ Behar will also provide support <br />during construction. <br />R.J.Behar & Company, Inc. <br />I!_tf�Trl Engineers • P l a n n e r s <br />RFQ No. 14 -07 -02 1 Page 12.49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.