My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIENT: <br />City of Pompano Beach <br />Engineering Division <br />1201 NE 5th Avenue <br />Pompano Beach, FL 33060 <br />Ms. Alessandro Delflco, PE <br />City Engineer <br />Tel: (954) 786 -4144 <br />Fax: (954) 786 -4028 <br />Email: <br />Alessandra.Delfrco0copbR. com <br />RJ BEHAR'S ROLE: <br />Basis of Design Report (BODR), <br />stormwater design, sanitary sewer <br />design of the wastewater collection <br />system and design ofproposed water <br />improvements, utility coordination, <br />permitting, and cost estimating <br />PROJECT STARTED: 412112014 <br />PROJECT COMPLETED: <br />Ongoing <br />CosT /FEES PAID: 866,179.00 <br />CONST. COST: N/A <br />CHANGE ORDERS: None <br />TIME EXTENSIONS: None <br />CONTRACT: Lump Sum <br />RJ BEHAR'S KEY PERSONNEL <br />Juan H. Vazquez, PE, PH, BCEE <br />Principal in Charge/ <br />Project Manager <br />Elmer Cardenas, PE <br />Project Engineer <br />Hans Murzi, PE <br />Project Engineer <br />The Lyons Park Neighborhood is located west of South Cypress Road, <br />north of McNab Road, east of South Flagler Avenue and south of <br />Southwest 8" Street. The area is served by an existing stormwater <br />collection system. The existing stormwater management system consists <br />of four independent systems, which discharge to systems outside of the <br />neighborhood. The ultimate outfalls are located to the south of West <br />McNab Road and to the east of South Cypress Road. The project area <br />suffers from flooding problems as documented in the City Stormwater <br />Master Plan (SWMP). This project intends to improve the drainage <br />systems within the project area. <br />The sanitary sewer lines within the Lyons Park Neighborhood are <br />located in the rear yard easements of the propenies/homes. One of the <br />City's Comprehensive Plan policies is to identify the feasibility of <br />implementing capital projects to relocate the sewer lines or to <br />rehabilitate them in place. This project intends to study the relocation of <br />the sewers to the street's right -of -way. No improvements are needed to <br />the existing lift stations. <br />The water system has been upgraded but the services used the older <br />black polyethylene pipe. This project intends to replace the service lines, <br />to meet the newer city standards 107 -1 and 107 -2, from the water mains <br />to the water meters. <br />The project will not include a reuse water irrigation system. The project <br />has been divided into two phases. Phase I will include the preparation <br />of a Basis of Design Report (BODR) and preliminary design of the <br />improvements. Phase 2 will include the design of the improvements, <br />bidding, and construction phase services. <br />R.J.Behar 8r Company, Inc. <br />II�tJTYI E n g i n e e r s • P l a n n e r s <br />RFQ No. 14 -07 -02 1 Page 12.51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.