Laserfiche WebLink
JAVIER RODRIGUEZ, PE <br />Hialeah Public Works Site Plan — City of Hialeah, Florida <br />® Engineer of Record — He was responsible for the site remodeling, demolition and reconstruction phasing of the City of <br />Hialeah Water and Sewer Department Complex. The project included extensive utility coordination to coincide with the <br />construction phasing for the project, new site layout, new exfiltration trench drainage system and design of new water and <br />sewer facilities to service site. <br />SR- 7/Sunrise Boulevard Lighting Design — City of Lauderhill, Florida <br />Project Manager for the lighting plans preparation — This project consisted of roadway lighting design for SR -7 (US-441) at <br />Sunrise Boulevard in the City of Lauderhill. The design was completed in accordance with FDOT roadway lighting criteria. <br />Due to numerous existing utilities, the light pole foundations included the design of spread - footings as well as extensive <br />coordination with utilities owners. The project also involved procuring a permit from FOOT. <br />Sunrise Athletic Complex, Additional Parking — City of Sunrise, Florida <br />Project Manager /Engineer of Record — He was in charge of providing engineering design services for the addition of parking <br />spaces at the Sunrise Athletic Complex within the City of Sunrise. <br />BC & FAU A. Hugh Adams Parking Garage — Davie, Florida <br />Design Engineer — The scope of this project consisted of civil engineering services for the design -build team for a five story <br />1,000 vehicle parking garage located in the Broward College Davie campus. <br />Town Engineer - Inspection Services — Town of Southwest Ranches, Florida <br />Project Manager — The scopes of services included inspection services, reviews of all building permits, fill permits, develop <br />cost estimates and prepared construction documents. <br />SR- 71Sunrise Boulevard Construction Inspection — City of Lauderhill, Florida <br />Project Manager — The scope was for the Construction Engineering Inspection Services for this intersection improvement <br />project in the City of Lauderhill. This project involved the widening and reconstruction of this major urban arterial intersection <br />and was accomplished through an agreement between the FDOT and the City. It included extensive utility coordination, <br />resulting from the widening of SR -7. The project was under FDOT oversight as SR -7 is a state road. The project also <br />involved drainage improvements, signalization and lighting. The project required a complex Maintenance of Traffic plan <br />including periodic lane closures. <br />® Construction Management Oversight — City of Lauderdale Lakes, Florida <br />Project Manager for the construction of 'The Island', a veteran's memorial park located at the intersection of SR -7 and SW <br />36"137" Street. RJ Behar advised the City of Lauderdale Lakes during construction and worked with the City to dose out <br />the project. Also, RJ Behar helped the City to obtain FDOT certification for Local Agency Program (LAP) funding for this <br />project as well as other of their capital improvement projects before construction. <br />2 <br />RR.J.Behar <br />RFQ No. 14-07-021 Page 13.5 <br />