Laserfiche WebLink
ROBERT BEHAR. PE <br />Ocean Avenue Bascule Bridge Over Intracoastal in Lantana, Palm Beach County, Florida <br />® <br />Principle in Charge for the Test Pile driving operation performed by the contractor, GLF Construction Company. The Pile <br />Driving Installation inspection consisted of verification of driving criteria for the test piles being driven as part of the test pile <br />installation plan, including pile location, design criteria, soil boring data, and installation operation. Collecting pile driving <br />data with saximeter in dose coordination with the Geotechnical Engineering Company (GRL), PDA analysis data collection <br />and pile driving evaluation, hammer energy determination, accessories verification and documentation, pile condition and <br />measurements, equipment and template location including survey monitoring, and documentation. The foundation for the <br />new bridge consists of Abutment 1 and Abutment 8, Intermediate Piers 2 through Pier 7, and bents for a new fishing pier. <br />W. 530 Street (from W. 12TH Avenue to W. 16TH Avenue) Construction Engineering Inspection (CEI) — City of <br />Hialeah, Florida; American Recovery & Reinvestment ACT (ARRA) <br />Principle in Charge for the West 53rd Street (from W. 12th Avenue to W. 16th Avenue) ARRA- funded Reconstruction <br />Project. <br />Compartment - C Construction Inspection, Clewiston, Florida — AECOMISouth Florida Water Management (SFWMD) <br />Principle in Charge — The field inspector provided change order reviews, material takeoffs, as -built plan reviews, contractor <br />payment application reviews, and processing change orders, submittals, field orders, requests for additional information and <br />payment requests. <br />S-197 Replacement Project Replacement Project, Construction Inspection Services — SFWMD <br />Principle in Charge - Responsibilities included scheduling material testing such as Earthwork tests with proctors and density <br />test performed on existing or imported materials, also concrete testing with slump test and cylinders made for each concrete <br />pour. The work performed each day was documented in written daitys also photographs were taken of all construction <br />activities. <br />S -332D Pump Station Hardening, Construction Management, Miami -Dade, Florida — SFWMD <br />Principle in Charge — This project involved the hardening and upgrading of the S -332D Pump Station located near <br />Homestead, Florida in Miami -Dade County. The project involved the hurricane hardening of the pump house and the <br />installation of bullet- proofing for the walls, roof and roofing system, exterior doors, louvers, HVAC upgrades and protective <br />opening hoods. The scope also included new weather -proof roof- mounted equipment access hatches, an OSHA safety <br />® ladder and roof perimeter safety railings and overall exterior repainting of the pump house walls and supporting exterior <br />concrete foundations, as well as con construction management and inspection support services. <br />Construction Management Oversight — City of Lauderdale Lakes, Florida <br />Principle in Charge — This project consisted of construction of 'The Island'at Veteran's Memorial Park located at the <br />intersection of SR -7 and SW 36"137" Street. RJ Behar advised the City of Lauderdale Lakes during construction and <br />worked with the City to dose out the project. RJ Behar helped the City obtain FDOT certification for Local Agency Program. <br />Miami River Greenways, Segment D — City of Miami, Florida <br />Principal in Charge — The project consists of the reconstruction of an existing roadway segment along the Miami River to <br />produce a scenic, landscaped, pedestrianlbicyde walkwaylgreenway. The project includes the design of a drainage system <br />with injection wells, decorative lighting and landscapemardscape design. <br />Davie Road Beautification Streetscape Project — Town of Davie, Florida <br />Principal in Charge for the Downtown Davie streetscape beautification designlbuild project. The project consisted of street <br />resurfacing, new lighting sidewalk replacement. <br />Town of Davie Local Agency Program (LAP) Certification — Town of Davie, Florida <br />Principal in Charge — RJ Behar assisted the Town of Davie in obtaining FDOT certification for Local Agency Program (LAP) <br />funding of town capital projects. <br />Stirling Road Loop Grant Assistance — Town of Southwest Ranches, Florida <br />Principal in Charge — RJ Behar assisted the Town of Southwest Ranches in obtaining funding for the construction of the <br />Stirling Road Loop Multipurpose Trail. Services provided cost estimates, conceptual plans and technical support during the <br />coordination phase. <br />NW 44th Street — City of Lauderdale Lakes, Florida <br />Project Manager — The project included the design and construction management of new construction for approximately 0.5 <br />mile. The scope of services included drainage plans, marking and signing plans and lighting plans. <br />Seven Isles Entry Beautification — City of Fort Lauderdale, Florida <br />Principal in Charge — The project consisted of improvements to the 7 isles entry way, these improvement induded, adding a <br />parking space on the west side of SE 231d Avenue as well as beatifying two of the existing bridges <br />WR.J.Behar <br />RFO No. 14 -07 -02 1 Page 13.7 <br />