|
CARLOS MAZORRA. PL
<br />SR- 8381Sundse Boulevard at NW 31" Avenue, Broward County, Florida — FDOT District 4
<br />® Project Manager in charge of the design and production of roadway plans, signing and pavement marking plans,
<br />signalization plans, and pedestrian upgrades. The scope of this safety improvement project was the addition of two left
<br />turn lanes, milling and resurfacing, and pavement widening and the addition of two new signal mast arms.
<br />SR- 8381Sundse Boulevard at NW 271^ Avenue, Broward County, Florida — FDOT District 4
<br />Project Manager in charge of the intersection improvements, rebuilding the signal system, milling and resurfacing the
<br />intersection approach and lighting improvements plans.
<br />Design/Build for 1 -595 Final Design Public- Private- Partnership Project, Broward County, Florida — FDOT District 4
<br />Task Manager — He was in charge of the design and production of the signalization design of twelve intersections and
<br />temporary signals, and for lighting plans from West of Flaming Road to East of Hiatus Road, Zones 2 and 3.
<br />SR- 845/Powedine Road, Palm Beach County, Florida — FDOT, District 4
<br />Project Engineer for signal design, which included 8 major signalized intersections with galvanized mast arms, signal
<br />analysis and new signal timings.
<br />SR- 51US- 11South Federal Highway, Deerfield Beach, Florida — FDOT, District 4
<br />Project Manager — He was responsible for the milling and resurfacing plans of the existing pavement; upgrading the signal
<br />pedestrian features to current American with Disabilities Act (ADA) standards, new signing and pavement markings with
<br />upgraded landscaping.
<br />SR- 9731NW 87"' Avenue /Galloway Road, Miami -Dade County, Florida — FDOT, District 6
<br />Project Engineer in charge of the signalization plans for the project.
<br />SR- 8061Adantic Avenue Milling & Resurfacing from Via Flora to RE of Congress Avenue, Palm Beach County,
<br />Florida — FDOT District 4
<br />Project Manager — He was responsible for the milling and resurfacing of a major arterial roadway, induding overseeing the
<br />drainage improvements, preparing the pavement marking and signing plans, lighting plans, eight signal location plans, a
<br />public involvement program and landscape improvements.
<br />Hollywood Boulevard/N. 28"' Avenue Intersection Improvement, Broward County, Florida — Broward County
<br />Engineering
<br />® Project Manager — He was responsible for overseeing the traffic study, and preparing the roadway plans, signalization
<br />plans, signage plans, drainage plans, ADA requirements and utility coordination for this major intersection improvement
<br />project.
<br />Hillsboro Boulevard /Military Trail Intersection Improvement, Broward County, Florida — Broward County
<br />Engineering
<br />Project Manager — He was responsible for overseeing the traffic study, and preparing the roadway plans, signalization
<br />plans, signage plans, drainage plans, ADA requirements and utility coordination for this major intersection improvement
<br />project.
<br />Atlantic Boulevard/Rock Island Road Intersection Improvement, Broward County, Florida — Broward County
<br />Engineering
<br />Reference: Mr. Richard Tomese, PE, Director of Broward County Engineering, (954) 5774579, Rtomese a()Broward.org
<br />Project Manager — He was responsible for overseeing the traffic study and preparing the roadway plans, signalization
<br />plans, signage plans, drainage plans, ADA requirements and utility coordination, and post design services for construction
<br />engineering inspection for a major intersection improvement. Project length: 0.501 miles
<br />NW 4411 Street, City of Lauderdale Lakes, Florida — Lauderdale Lakes
<br />Reference: Ms. Sonia M. Torres, PE, LEED AP, City Engineer - Public Works and Engineering Services, (954) 535 -2712,
<br />stores dlauderdatelakes.oro
<br />Project Manager — He was responsible for the design of roadway plans, signing and marking plans, privacy walls, traffic
<br />projections and warrant analysis, utility coordination, inspection services and oversaw the drainage and permitting for
<br />this reconstruction project.
<br />SR- 5NS- 11Federal Highway Resurfacing, Boca Raton, Florida — FDOT, District 4
<br />Reference: Ms. Vanita Saini, PE, FDOT Project Manager, (954) 777 -4468, Vanita.saini(o )dot.state.fl.us
<br />Project Manager — He was responsible for the milling and resurfacing plans of the existing pavement; upgrading the signal
<br />pedestrian features to current American with Disabilities Act (ADA) standards, new signing and pavement markings with
<br />upgraded landscaping.
<br />r1
<br />ICJ
<br />R.J.Behar
<br />RFD No. 14 -07 -021 Page 13.12
<br />
|