Laserfiche WebLink
RAFAEL DE ARAZOZA, PE, PTOE, CPM <br />® safety studies, potential impacts of proposed land use developments. He successfully developed traffic calming and traffic <br />engineering studies for the Town. As one of the key staff, he contributed successfully in the development of the Town's <br />Transportation Element and Transportation Master Plan. <br />Update of the Transportation Element, City of Hialeah, Florida — Miami -Dade County <br />Project Manager who updated of the City's Transportation Element to incorporate the annexed area northwest of the existing <br />City boundaries. The study consisted of analyzing existing and future conditions on the transportation system and <br />developing a future transportation system to include required improvements. This project was extensively coordinated with <br />reviewing agencies and received approval by the City Council as well as both State agencies, the Department of Community <br />Affairs and the FOOT. <br />SR-874/Don Shula Expressway Ramp Connector to SW 13P Street (PD &E) Study — Miami -Dade Expressway <br />Authority <br />Project Engineer in charge of the required traffic engineering analysis and the development of major documents, such as the <br />Interchange Modification Report (IMR) and the Design Traffic Technical Memorandum (DTTM). The study consists of the <br />preparation of the PD &E traffic report, for the SR-874/Don Shula Expressway Ramp Connector to SW 1361, Street. The <br />study assesses existing and future traffic operations of the interchange, given a No-Build scenario, and up to four Build <br />scenarios. Project length: 4 miles. <br />Safe Routes to School Plans Study — Miami -Dade County Metropolitan Planning Organization <br />Task Manager — He coordinated the tasks involved in the project. RJ Behar conducted field reviews to verify the <br />improvements and gather additional information to facilitate the development of cost estimates. RJ Behar developed the <br />spreadsheets utilizing the latest cost rates available from FOOT District 6. <br />Strategic Interrnodal System (SIS) Action & Master Plans — FDOT D6 <br />He was a member of the statewide technical committee who assisted with the development and establishment of the SIS. <br />He directed the development of the SR- 99711(rome Avenue and US- 2710keechobee Road Action Plans and the Following <br />® Master Plans: 1 -95 and 1 -195 in District 6. <br />Donald Ross Road and 1.95 Interchange — Interchange Operational Analysis Report (IOAR) Palm Beach County, <br />Florida — Palm Beach County Department of Engineering & Public Works Division of Roadway Production <br />Project Manager — RJ Behar is providing professional Traffic Engineering Services, for the IOAR (Interchange Operational <br />Analysis Report). The study area includes the two signalized intersections west and east of the 1-95/Donald Ross Road <br />Interchange and the intersections of Donald Ross Road with Heights Boulevard east of the interchange. Additionally, the <br />unsignalized intersection of 64" Drive N. and Donald Ross Road, located west of the interchange, is included. The study will <br />include the appropriate ramps within the subject interchange. <br />0 <br />am <br />RFQ No. 14-07-021 Page 13.14 <br />