|
J E R R Y P [CC O 1-0 . P E
<br />1.95 Bridge over Donald Ross Road & C -18 Canal — FDOT, District 4
<br />® Structural Design Engineer — This project, for the Florida Department of Transportation, involved the widening of two
<br />medium span bridges. He prepared the bridge development report, structural plans, sound wall and retaining wall design.
<br />The design included the development of technical special provisions and permit coordination.
<br />US-1 Bridge over Biscayne Canal — FDOT, District 6
<br />Structural Design Engineer — His responsibilities included marketing, price negotiations, client contact, project management
<br />and QC/QA for this project.
<br />NW 12th Street — FDOT, District 6
<br />Structural Design Engineer — His responsibilities induced marketing, price negotiations, client contact, project management
<br />and QC/QA for this project.
<br />West 471h Street — FDOT, District 6
<br />Structural Design Engineer — His responsibilifies induded marketing, price negotiations, client contact, project management
<br />and QC/QA for this project
<br />45th Street Bridge — FDOT Turnpike Enterprise
<br />Structural Design Engineer — His responsibilifies included marketing, price negotiations, client contact, project management
<br />and QC/QA for this project.
<br />Oakland Park Boulevard Bridge over the C -13 Canal — FDOT, District 4
<br />Structural Engineer — He was responsible for the design, shop drawings review and construction support for this structure.
<br />SR 530 — FDOT, District 5
<br />Structural Engineer — Mr. Piccolo designed the bridge, sign structures and mast arms for this project.
<br />SR 85 Highway & Bridge Widening — FDOT, District 3
<br />Structural Design Engineer — His responsibilities induded markefing, price negofiations, client contact, project management
<br />and QC/QA for this project.
<br />McClure Road Bridge Replacement — FDOT District 4
<br />Structural Engineer — His responsibilities included marketing, price negotiations, client contact, project management and
<br />QC/QA for this project.
<br />® US -27 Bridge Widening over Helena Run — FDOT, District 5
<br />Structural Design Engineer — His responsibilities induded markefing, price negotiations, client contact, project management
<br />and QC/QA for this project.
<br />Hidden Acres Estates Feasibility Study — South Florida Water Management District (SFWMD)
<br />Structural Engineer — He performed structural evaluation of the feasibility to raise 17 mobile homes and attachments above
<br />projected flood levels. The project was part of the Kissimmee River restoration project.
<br />1 -95 Bridge Repairs from Miami -Dade County Line to Griffin Road, FDOT
<br />Structural Engineer — This project for FDOT included the repair and upgrade of 16 bridges along 1 -95. The expansion joint
<br />seals at each bridge were replaced. The adjacent headers and steel armor angles were repaired as necessary. The project
<br />also included structural pile jackets, spall repairs, riprap repairs and class V finish. During constructon we reviewed shop
<br />drawings, responded to RFI's and assisted the CEI in making field decisions regarding the header repairs:
<br />ROADWAY PROJECT DESIGN EXPERIENCE
<br />Poweriine Road (SR -845) Broward County, Florida — FDOT, District 4
<br />Engineer — He provided Quality Control reviews and mast arm calculations.
<br />1.595 Highway Improvements, Broward County, Florida — FDOT, District 4
<br />Engineer — He provided design calculations for the overhead sign trusses.
<br />1 -95 HOV, Palm Beach County, Florida — FDOT, District 4
<br />Engineer — He performed the Quality Control review for two separate 1 -95 HOV design contracts. The scope of services
<br />included geometrics, drainage, signing and marking with traffic control reviews.
<br />1.95 Resurfacing, Broward County, Florida — FDOT, District 4
<br />Engineer — He provided Quality Control reviews and prepared bridge joint repair plans.
<br />SR-806 (Atlantic Avenue) Palm Beach County, Florida — FDOT, District 4
<br />Provide Quality Control reviews and mast arts calculations. Project included resurfacing (RRR) of a 2.8 miles section from
<br />Via Flora to Congress Avenue. The project included complete design of resurfacing 2.8 miles off a major arterial roadway,
<br />induding drainage improvements, pavement marking and signing, lighting plans, 8 signal locations, a public involvement
<br />program, and landscape improvements. Project length: 2.8 miles.
<br />® Commercial Boulevard, Broward County, Florida — FDOT, District 4
<br />Engineer — He performed Quality Control reviews and mast arm calculations.
<br />1% R.J.Behar
<br />�nl RFQ No. 14 -07 -02 1 Page 1 3.19
<br />
|