DAVID ROMANO, PE
<br />Senior Project Engineer — He oversaw CEI operations which included ensuring the inspectors on site were maintaining
<br />® dose coordination with the Dept Project Manager, City of Deerfield Beach Public Works Dept, and neighboring residential
<br />communities and businesses. The project consisted of milling, resurfacing, shoulder widening, minor drainage
<br />improvements, signalization and video detection improvements at the major intersections. Sidewalks were provided on the
<br />north side of the roadway, including ADA upgrades at the crosswalks, guardrail enhancements over the existing bridge
<br />structure, and landscaping improvements throughout the project. Cost/Fees Paid: $402,400.00 Construction Cost:
<br />$2,069.003.05
<br />W.16'" Avenue from W. 76"' Street to W. 84'" Street, Hialeah, FI— City of Hialeah
<br />Senior Project Engineer — He was responsible for overseeing the Construction Engineering and Inspection operation,
<br />ensuring that the adherence to the rules and regulations set forth by FDOT speculations as well as ensure the Federal
<br />ARRA regulations were being followed. He oversaw all document control, change orders, pay requests, shop drawing logs,
<br />daily inspection reports and the completion of the project closeout. Cost/Fees Paid: $48,699.00 Construction Cost:
<br />$354,358.13 Contractor: Williams Paving, Inc.
<br />Replacement of Downtown North Miami Brick Pavers, Local Agency Program (LAP) and American Recover &
<br />Reinvestment Act (ARRA) Project, North Miami, FL — City of North Miami
<br />Reference: Mr. Aleem Ghany, PE, Director of Public Works, City of North Miami (305) 895 -9830
<br />Senior Project Engineer — His responsibilities entailed the management of the project and all construction engineering
<br />personnel. Mr. Romano ensured that all the project documentation, including the sampling and testing of the material
<br />furnished, was being completed per the project schedule and all federal ARRA regulations were met. Cost/Fees Paid:
<br />$90,420.00 Construction cost: $821,000 Contractor: Florida Construction and Engineering, Inc.
<br />W. 531d Street from W. 120' Avenue to W. IP Avenue, American Recover & Reinvestment Act (ARRA) Project,
<br />Hialeah Fl — City of Hialeah
<br />Project Manager /Senior Project Engineer - Responsible for the construction engineering and inspection (CEI) operation of
<br />this project. This included overseeing the inspections that were preformed, shop drawing approval, cost estimates that
<br />were process and all other tasks performed by the CEI team. Mr. Romano also ensures that all procedures and regulations
<br />were performed per the Federal ARRA regulation standards and well as the Florida department of Transportation.
<br />Ocean Avenue Bascule Bridge Over Intracoastal, Lantana, Fl - Palm Beach County
<br />Senior Project EngineedTask Manager — Oversaw the inspector for the pile driving operation. The pile driving installation
<br />inspection consisted of verification of driving criteria for the test piles being driven as part of the test pile installation plan,
<br />including pile location, design criteria, soil boring data, installation operation, collecting pile driving data with saximeter in
<br />dose coordination with the Geotechnical Engineering Company, PDA analysis data collection and pile driving evaluation,
<br />hammer energy determination, accessories verification and documentation, pile condition and measurements, equipment
<br />and template location including survey monitoring, and documentation.
<br />Pines Boulevard (SR -820) and 1.75 (SR -93) Interchange, Local Agency Program (LAP) project, Pembroke Pines, Fl
<br />— City of Pembroke Pines
<br />Senior Project Engineer - Mr. Romano managed the CEI contract, supervised and oversaw the field inspection; ensured
<br />proper interpretation of the plans and specifications, checked the drilled shaft log records on all signals, high mast lights,
<br />and overhead truss structure sign foundations; reviewed and jointly approved with FOOT District Lab the contractor's
<br />drilled shaft installation plan; reviewed and analyzed engineer analysis reports for deficient items encountered during
<br />construction; ensured CSL Testing was performed as per the FDOT Specifications; provided guidance and resolution on
<br />field changes that took place; coordinated with the Engineer of Record.
<br />Pines Boulevard (SR -820) and 1.75 (SR -93) Bridge Deck Repair, Local Agency Program (LAP) Project, Pembroke
<br />Pines, Fl — City of Pembroke Pines
<br />Reference: Mr. Joe McLaughlin, PE (954) 435 -6511; Mr. John Danielson, PE, FOOT District 4 -
<br />Senior Project Engineer — Mr. Romano was responsible for overseeing the demolition and reconstruction of the concrete
<br />bridge deck, the final placement, casting, curing, and the final surface acceptance of the new concrete overlay deck as
<br />well as the supervision of all construction inspectors on this job. He monitored the extensive coordination and MOT set -up
<br />that was required on 1 -75 during the Pines Blvd. bridge deck demolition operations. Mr. Romano oversaw the removal and
<br />demolition of the existing concrete bridge deck to a depth of 3.5' or % below the top mat of reinforcing steel as well as the
<br />sandblasting of all exposed reinforcing steel members of all rust and corrosion, oil, and dirt. He managed the review of
<br />existing steel mats for possible steel deterioration, and verified the re- installlsplice of new reinforcing steel as necessary.
<br />District 4 Cost/Fees Paid:$ 163, 938.94 Construction cost: $437,835.78
<br />r�
<br />LJ
<br />RFQ No. 14 -07 -02 1 Page 13.21