Laserfiche WebLink
I g% <br />Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering • 3D Subsurface Imaging • Utility Coordination <br />William Tanto <br />Project/ Utility Coordinator <br />Subsurface Utility Engineering <br />Mr. Tanto has over 20 years of experience in the <br />engineering design, permitting, construction and <br />utility locates fields. <br />Responsible for a variety of Engineering design and Project Coordination tasks <br />included but not limited to conceptual stormwater management, conveyance <br />design, land development site design, project permit application and illustration <br />preparation, construction observation, contract documents, Utility coordination <br />with existing utility owner, Utility review and mark ups, As -Built record research. <br />Mr. Tanto is responsible for allocating projects and resources to the <br />departments or individuals. His work involves providing the deadlines as well as <br />the resources that are required to complete the project on time to the assigned <br />personnel. He coordinates with all the departments in carrying out the project in <br />the required time. <br />Selected Relative Experience: <br />Okeechobee County Fl. NRCS Emergency Watershed Program. Project <br />Manager which included investigate, research, document areas damaged by <br />the hurricane. Prepare documents for review and approval from NRCS. Design, <br />construction plans, contract documents, permitting. bidding & awarding project, <br />construction observation and safety. <br />Broward County, Fl. Court House, Three - Dimensional Radar Tomography study. <br />Project Utility Coordinator which includes contracting all utility owner for <br />existing utility documentation, field investigation, video and photograph of <br />utility locations. Prepare and maintain project schedule. Assist department <br />managers in managing project work flow. <br />Village of El Portal FOOT / LAP Project, Roadway Widening, Milling & <br />Resurfacing with Minor Improvements. CEI for the Village of El Portal which <br />included approval of materials, construction observation, on -site material <br />quantities, As -Built Review and Complete FDOT forms and documents for final <br />review and approval. <br />Palm Beach County Fl. Sanitary Sewer Pump Station 9 North. Three - <br />Dimensional Radar Tomography study Project Utility Coordinator which includes <br />contracting all utility owner for existing utility documentation, field <br />investigation, video and photograph of utility locations. Prepare and maintain <br />project schedule. Assist department managers in managing project work flow. <br />Rufus 2.0 Seattle WA. Three - Dimensional Radar Tomography study Project <br />Utility Coordinator which includes contracting all utility owner for existing utility <br />documentation, field investigation, video and photograph of utility locations. <br />Prepare and maintain project schedule. Assist department managers in <br />managing project work flow. Set up logistics, logging, equipment and crew <br />transportation. <br />Craig A. Smith & Associates, Inc. <br />RFQ No. 14 -07 -02 <br />Page 47 <br />