Laserfiche WebLink
DSunny Isles Beach RFQ No. 14 -07 -02 Section 2: Qualifications <br />Landscape P.rchitecWre <br />Past Performance on Public Projects <br />ORDA is extremely proud of its record of performance with public agencies. In order to achieve contin- <br />ued success, the firm places extreme importance on the management and control of each project. As a <br />testament to our commitment to our clients, ORDA has been serving as the Landscape Architectural <br />Consultant to the City of Aventura since its inception in 1995 performing tasks such as site plan review, <br />permit review and inspections, park design, streetscape design, irrigation design, maintenance specifica- <br />tions and schedules, landscape studies, tree surveys, maintenance monitoring including analysis and <br />evaluation of existing landscape conditions and recommendations for improvements. <br />Most recently, ORDA provided landscape architecture services as part of the private - public partnership <br />between the City of Doral and the Codina Development Co. for ' Doral City Park' located in the heart of <br />1 downtown Doral's new city center. ORDA understands the importance of preserving and creating com- <br />munity spaces and public realm areas as part of a municipality's efforts to create livable cities. ORDA <br />recently provided landscape architecture services for the Town of Golden Beach's green space network <br />including conceptual design, design development and construction documentation services for North <br />Park, South Park and Singer Park that provide opportunities for active and passive recreation, a 2 -mile <br />parcourse circuit and extensive landscaping. We have a long history of successfully completed projects <br />in South Florida are sensitive to the unique environmental issues associated with this area. <br />Schedule of Proposed Services <br />A schedule of proposed services for a typical landscape architectural project for the City of Sunny Isles <br />Beach includes the initial task of site inventory and analysis, reviewing available plans, surveys and doc- <br />umentation depicting existing conditions of the project site, reviewing local codes and ordinances, design <br />standards and any other information related to the project. The on -site analysis will include verification <br />of utilities, obstructions, existing vegetation, opportunities, constraints, and any other pertinent elements <br />not depicted on the available plans. Following site inventory and analysis is the preparation of conceptual <br />alternatives that depict the character and intent of the design. The Conceptual Design plans will include <br />an analysis of existing conditions such as scenic values, areas of emphasis, visibility, safety, cost and <br />maintenance considerations. A preliminary estimate of Probable Construction Cost at the conceptual <br />Q phase will help the City establish a construction budget if one has not already been established. If <br />deemed advisable by City staff, the Conceptual design alternatives will be presented to the City Commis- <br />sion. <br />O'LEARY RICHARDS DESIGN ASSOCIATES, INC. 8 <br />