Laserfiche WebLink
Westview Place: Scope of work included the design of a sanitary sewer pump station to serve a 35 <br />townhome development in Miami -Dade County. The project included the design of 60 LF of four (4) <br />inch force main connection to an existing force main. Responsibilities included permitting through <br />Miami -Dade DERM, the City of North Miami, and the health department. It also included coordination <br />with FPL for the crossing of a major transmission line along NW 119 Street. <br />Miami International Airport- South Terminal Expansion Project Office Trailer: Prepared design <br />calculations and construction documents for pump station upgrade serving the South Terminal trailer <br />complex. Scope included permitting and coordination with Miami -Dade Aviation Department (MDAD), <br />Miami -Dade DERM, Building and Zoning Department. Provided construction observation and final <br />certification services and coordinated with electrical engineer on the pump station electrical <br />components. <br />Florida Power & Light Spangler Substation: Preparation of design and construction documents for <br />a new electrical substation. Services provided included paving, grading and drainage, septic tank <br />design, future sewer service coordination, storm water pollution prevention plan, and construction <br />observation. <br />Miami -Dade County Public Works Department- Lormar Drainage Subdivision Improvements: <br />Responsible for the design of the drainage improvements for the Lormar Subdivision between SW 96th <br />Terrace to SW 101 st Street from SW 146th Avenue to SW 147th Avenue; and SW 147th Avenue from <br />SW 88th Street to SW 90th Street (approximately 1000 LF south of SW 88th Street). The task included <br />coordination with FPL and other utilities to accomplish the placement of the proposed exfiltration trench <br />while minimizing utility conflicts and disruptions to the residents. <br />Florida Power & Light Stirling Substation: Preparation of design and construction documents for the <br />expansion of an existing electrical substation. Services provided included paving, grading and drainage, <br />storm water pollution prevention plan, and construction observation. <br />Port Everglades Terminal 18: Project manager for the design, permitting and construction observation <br />for the Terminal 18 expansion as required for the newest and largest single cruise ship terminal in the <br />world. Services included paving, drainage, well design, water main extension and service, sewer main <br />extension and service, construction observation and administration. <br />Port Everglades Terminal 21, North Port, & Terminal 18 Phase I: Construction management and <br />administration services for the expansion /renovation of several cruise and cargo terminals at Port <br />Everglades. <br />Port Everglades Terminal 16: Project manager for the design, permitting and construction observation <br />for the Terminal 16 container yard. Services included paving, drainage, well design, water main <br />extension and service, sewer main extension and lateral, construction observation and final certification <br />with Florida Department of Environmental Protection (FDEP), Broward County and the Health <br />Department. <br />City of Miramar Water Use Permits: Prepared water use permits to the South Florida Water <br />Management District for the City's irrigation pumps. <br />CORDOVA RODRIGUEZ & ASSOCIATES, INC. <br />February 2014 <br />Cordova Rodriguez & Assoc., Inc. RFQ# 14 -07 -02 43 <br />