|
24
<br />RFO No. 14 -07 -02
<br />Ovidio Rodriguez, PE, LEED AP
<br />Electrical Engineer
<br />Education
<br />MS, Construction Management, Florida
<br />International University, 2004
<br />BS, Electrical Engineering, Universidad
<br />de la Habana, Cuba, 1977
<br />Licenses /Registrations
<br />Professional Engineer (Electrical),
<br />Florida, #55995,
<br />Professional Engineer (Electrical),
<br />Georgia, #PE036285
<br />Professional Engineer (Electrical),
<br />Texas, #110516
<br />NCEES Certificate, #45366
<br />LEED Accredited Professional
<br />Years of Experience
<br />37
<br />Ovidio has extensive
<br />management, Construction.
<br />and design experience,
<br />and keeps an effective and
<br />timely communication with
<br />the client, contractor, and
<br />the team. He is the division
<br />quality representative (DOR)
<br />for engineering in the Miami
<br />office, participating in internal
<br />quality audits.
<br />Similar Experience
<br />City of Sunny Isles Beach, Heritage
<br />Park and Parking Garage, Sunny
<br />Isles Beach, FL. Planning and
<br />design for a new parking garage
<br />which was incorporated into a new
<br />4 -acre community park.-The 500+ car
<br />garage consists of 4- levels of parking
<br />and includes functional space for
<br />concessions, park support space, and
<br />public works at the first level. The
<br />park component includes a children's
<br />playground, plaza and gazebo.
<br />City of Sunny Isles Beach,
<br />Government Center, Sunny Isles
<br />Beach, FL.A 58,000- square -foot
<br />government complex inclusive of city
<br />hall, commission chambers, police
<br />facility, and a public library. Due to the
<br />facility's adjacency to the waterfront,
<br />the building will be designed to
<br />withstand most hurricanes.Also
<br />included is a parking garage.
<br />Collier County Government Center
<br />Fixed Term Contract Naples, FL.
<br />Electrical Engineer for this fixed term
<br />contract included the renovation of the
<br />existing courthouse and improvements
<br />to the existing jail facility. As part of the
<br />renovation process the sixth floor was
<br />design to meet LEED Cl certification
<br />standards and will feature energy
<br />efficient lighting, mechanical systems,
<br />and sustainable finishes. The jail
<br />improvements consisted of two major
<br />components, exterior stucco / window
<br />replacement and under -slab plumbing
<br />replacement.
<br />Village of Key Biscayne Government
<br />Center Key Biscayne, FL. Role:
<br />Electrical Engineer. The Government
<br />Center Building is composed of 33,158
<br />SF of program that includes police and
<br />public works related functions. AECOM
<br />was selected for the administration
<br />and police building. The building is
<br />designed around a two -story courtyard
<br />connecting the pedestrian circulation
<br />Section 3
<br />AECOM
<br />from the main street building entrance
<br />with a pedestrian garage entrance to
<br />the south.
<br />Palm Beach County Courthouse
<br />Historic Preservation and Renovation,
<br />West Palm Beach, FL. Electrical
<br />Engineer for the restoration of a 4 -story,
<br />40,000 SF 1916 County Courthouse
<br />was ultimately chosen as the facility
<br />to house a variety of historic and
<br />public use functions. Phase I of this
<br />project was the selective demolition
<br />of three additions which had obscured
<br />the building's original Gothic Revival
<br />architectural style. Phase II was the
<br />restoration of the 1916 building to its
<br />original grandeur.The facility included
<br />fully restored ceremonial display
<br />courtroom.
<br />City of Miramar Cultural Center,
<br />Miramar, FL. Role: Electrical Engineer.
<br />The Cultural Arts Center is a multi -use
<br />community facility which will provide
<br />the citizens of Miramar with a variety
<br />of functions including: an 814 -seat
<br />auditorium / performing arts space
<br />inclusive of a mezzanine; an art gallery /
<br />exhibition area; multipurpose and sub -
<br />dividable meeting rooms; a full service
<br />kitchen: classrooms: administrative
<br />support space and an outdoor
<br />amphitheater.
<br />Publix Supermarkets, Inc, Continuing
<br />Contract, FL. AECOM has been
<br />responsible for renovation of
<br />approximately 35 stores in various
<br />locations throughout Florida. Typical
<br />projects range in size from 20,000
<br />square feet to 60,000 square feet.
<br />AECOM works within the parameters
<br />of a design prototype established to
<br />ensure consistency among stores.
<br />
|