Laserfiche WebLink
24 <br />RFO No. 14 -07 -02 <br />Ovidio Rodriguez, PE, LEED AP <br />Electrical Engineer <br />Education <br />MS, Construction Management, Florida <br />International University, 2004 <br />BS, Electrical Engineering, Universidad <br />de la Habana, Cuba, 1977 <br />Licenses /Registrations <br />Professional Engineer (Electrical), <br />Florida, #55995, <br />Professional Engineer (Electrical), <br />Georgia, #PE036285 <br />Professional Engineer (Electrical), <br />Texas, #110516 <br />NCEES Certificate, #45366 <br />LEED Accredited Professional <br />Years of Experience <br />37 <br />Ovidio has extensive <br />management, Construction. <br />and design experience, <br />and keeps an effective and <br />timely communication with <br />the client, contractor, and <br />the team. He is the division <br />quality representative (DOR) <br />for engineering in the Miami <br />office, participating in internal <br />quality audits. <br />Similar Experience <br />City of Sunny Isles Beach, Heritage <br />Park and Parking Garage, Sunny <br />Isles Beach, FL. Planning and <br />design for a new parking garage <br />which was incorporated into a new <br />4 -acre community park.-The 500+ car <br />garage consists of 4- levels of parking <br />and includes functional space for <br />concessions, park support space, and <br />public works at the first level. The <br />park component includes a children's <br />playground, plaza and gazebo. <br />City of Sunny Isles Beach, <br />Government Center, Sunny Isles <br />Beach, FL.A 58,000- square -foot <br />government complex inclusive of city <br />hall, commission chambers, police <br />facility, and a public library. Due to the <br />facility's adjacency to the waterfront, <br />the building will be designed to <br />withstand most hurricanes.Also <br />included is a parking garage. <br />Collier County Government Center <br />Fixed Term Contract Naples, FL. <br />Electrical Engineer for this fixed term <br />contract included the renovation of the <br />existing courthouse and improvements <br />to the existing jail facility. As part of the <br />renovation process the sixth floor was <br />design to meet LEED Cl certification <br />standards and will feature energy <br />efficient lighting, mechanical systems, <br />and sustainable finishes. The jail <br />improvements consisted of two major <br />components, exterior stucco / window <br />replacement and under -slab plumbing <br />replacement. <br />Village of Key Biscayne Government <br />Center Key Biscayne, FL. Role: <br />Electrical Engineer. The Government <br />Center Building is composed of 33,158 <br />SF of program that includes police and <br />public works related functions. AECOM <br />was selected for the administration <br />and police building. The building is <br />designed around a two -story courtyard <br />connecting the pedestrian circulation <br />Section 3 <br />AECOM <br />from the main street building entrance <br />with a pedestrian garage entrance to <br />the south. <br />Palm Beach County Courthouse <br />Historic Preservation and Renovation, <br />West Palm Beach, FL. Electrical <br />Engineer for the restoration of a 4 -story, <br />40,000 SF 1916 County Courthouse <br />was ultimately chosen as the facility <br />to house a variety of historic and <br />public use functions. Phase I of this <br />project was the selective demolition <br />of three additions which had obscured <br />the building's original Gothic Revival <br />architectural style. Phase II was the <br />restoration of the 1916 building to its <br />original grandeur.The facility included <br />fully restored ceremonial display <br />courtroom. <br />City of Miramar Cultural Center, <br />Miramar, FL. Role: Electrical Engineer. <br />The Cultural Arts Center is a multi -use <br />community facility which will provide <br />the citizens of Miramar with a variety <br />of functions including: an 814 -seat <br />auditorium / performing arts space <br />inclusive of a mezzanine; an art gallery / <br />exhibition area; multipurpose and sub - <br />dividable meeting rooms; a full service <br />kitchen: classrooms: administrative <br />support space and an outdoor <br />amphitheater. <br />Publix Supermarkets, Inc, Continuing <br />Contract, FL. AECOM has been <br />responsible for renovation of <br />approximately 35 stores in various <br />locations throughout Florida. Typical <br />projects range in size from 20,000 <br />square feet to 60,000 square feet. <br />AECOM works within the parameters <br />of a design prototype established to <br />ensure consistency among stores. <br />