Laserfiche WebLink
k <br />r� <br />r <br />f <br />F <br />K <br />i <br />,r <br />r{ <br />fi <br />R <br />i <br />,r <br />;r <br />C <br />(r <br />r; <br />P <br />r( <br />34 RFn No. 14 -07 -02 <br />Task 5: Bid / Negotiation Phase Services <br />Typically during the bid process, we will assist the <br />City with Pre -Bid Conference, responses to bidder <br />inquiries, preparation of any Addenda, and review and <br />evaluation of bids received and bidder qualifications. <br />Task 6: Construction Observation <br />Construction phase services normally will commence <br />upon award of a contract for construction and will <br />conclude upon issuance of a certificate of Final <br />Completion, City acceptance of the project and sign - <br />off of all necessary regulatory agencies. During the <br />construction phase, and as appropriate to the type <br />and scope of project, services provided will typically <br />include the following: <br />• Periodic on site observations of the progress of the <br />work, to help ensure that project specifications, <br />design intent and other requirements are complied <br />with <br />• Regular progress meetings with Contractor and City <br />staff <br />• Review of Contractor's Construction Schedule, <br />Schedule of Values, materials submittals, shop <br />drawings, pay applications and other submittals <br />• Review of tagged nursery stock or assistance with <br />tagging <br />• Review of field layouts prior to installation <br />• Review of installed materials for compliance with <br />requirements <br />• Inspection and punch list at Substantial completion <br />• Inspection and certificate at Final Completion <br />We recognize that in certain cases, the City may opt <br />to provide more of the construction administration <br />through in -house staff; or that conversely, certain <br />projects may require a more extensive role on the <br />part of the design consultant. Finally, we will provide <br />follow -up after construction is completed, typically <br />in the form of follow -up inspections prior to the <br />expiration of warranties approximately one year after <br />completion of the project. Throughout the design <br />process, AECOM's project manager and team will <br />provide the following services: <br />Coordinate the project with the City of Sunny Isles <br />Beach, related permitting agencies, adjacent <br />landowners and other affected organizations during <br />the development of the design. <br />Perform general administration duties, including <br />coordination with sub - consultants; preparation <br />of invoices; scheduling; record keeping; and file <br />management. <br />Section 4 AECOM <br />• Attend and participate in meetings with the above <br />mentioned organizations. <br />• Oversee quality assurance and quality control (OA/ <br />OC) program. Each scheduled submittal of plans to <br />the Client and /or FDOT shall receive OA /OC. <br />• All work shall be performed in accordance with the <br />City's /County's Standards and Procedures for plans <br />and specifications. <br />• All work shall be performed in English units using <br />AutoCAD format. <br />Engineering <br />AECOM believes that our greatest achievements are <br />delivering a quality project within the clients allocated <br />schedules and budgets. For each successful project <br />it is imperative, and our Project Engineers make sure <br />that the project team remains attentive to quality <br />control, schedules, and budgets throughout the <br />progress of the design. <br />An essential step in completing an assignment is <br />the preparation of a detailed work plan. AECOM will <br />be responsible for ensuring that each of the work <br />orders under this contract is carried out successfully, <br />and that means to your complete satisfaction. A <br />specific and individual work plan will be prepared <br />for each work order. The purpose of the work plan <br />is to communicate the essential information about <br />the project and specific client needs to the project <br />team. The work plan (or project management plan) will <br />include the project budget, project schedule and a <br />project quality control plan. <br />Project Schedule <br />A given work order's schedule for completion is <br />often based on your needs as the client in serving <br />your customers. We are able to meet almost any <br />reasonable deadline, and typically even a highly <br />accelerated deadline for a project's completion <br />through the assignment of additional staff from <br />our Florida -wide and national offices. Gaining a full <br />understanding of your needs allows such critical <br />staffing assignments to be made early on. <br />Often times in lieu of costly fast - tracking of a design <br />and construction project, we may be able to offer <br />construction sequencing alternatives that will allow <br />your requirements to be met part -way through <br />completion. This was the case for the Rotonda WRF <br />Expansion project, where a 1.0 MGD phase of a 2.0 <br />MGD project was available one year into the two -year <br />construction project. <br />