My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:53:10 AM
Creation date
8/26/2014 10:37:26 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2 - QUALIFICATIONS <br />REQUEST FOR QUALIFICATIONS NO. 14 -07 -02 <br />City of Tamarac Storm Drainage Master Plan <br />City of Tamarac <br />6011 Nob Hill Road <br />Tamarac, Florida 33321 <br />• Mr. Jack Strain, P.E. <br />Director of Public Works <br />Phone: (954) 597 -3701 <br />• Mr. John Doherty, P.E. <br />City Engineer/ Assistant Director of Public Works <br />Phone: (954) 597 -3706 <br />Initial - $238,040.00 <br />Billed - $212,899.50 <br />Craven Thompson and Associates has performed an extensive <br />drainage study for the City of Tamarac. <br />The City's entire stormwater system was <br />analyzed through field survey, LIDAR <br />topographical information. and interviews of City <br />and County staff. The City was provided with a <br />detailed model which simulated the impacts to <br />be expected during 10, 25 and 100 year storm <br />events and allows the City to evaluate the <br />impacts of future development on the existing <br />drainage system. The report included proposed <br />improvements to problematic areas. This Master <br />Plan included South Florida Water Management <br />District canal basin studies to analyze the <br />impacts of the District's canals on the City's <br />stormwater system. <br />STORM DRAINAGE <br />MASTER PLAN <br />CRAVEN THOMPSON & ASSOCIATES. INC. 1 3563 NW 531- STREET. FORT LAUDERDALE, FL 33309 1 P 954.739.6400 <br />2 1 Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.