Laserfiche WebLink
a <br />w�a•ncvaoi :.�� c <br />PROIECTNAME <br />cuENT <br />STUDY START DATE <br />APPROXIMATE <br />CONSTRUCTION COST <br />PROIECTSTATUS <br />ENGINEER'S FEES <br />PROJECT SUMMARY <br />SECTION 2 - QUALIFICATIONS <br />REQUEST FOR QUALIFICATIONS NO. 14-07 -02 <br />Pompano Place and Andrews Avenue Basin Stormwater Study <br />Pompano Beach, Florida <br />Ms. Alessandra Delfico. P.E.. <br />City Engineer <br />City of Pompano Beach <br />1201 NE 5� Avenue <br />Pompano Beach. Florida 33060 <br />Phone: (954) 786 -4144 <br />Email: Alessandra.Delfico @coobfl.com <br />October 2013 <br />Engineer's Estimate: $4 Million <br />Study - 15% Complete <br />$85,380.00 <br />The City of Pompano Beach retained Craven Thompson & Associates, <br />Inc. (CTA) to explore alternative design scenarios for improvements <br />within stormwater Study Area 1 - Pompano Place and Andrews Avenue <br />bounded on the north by SW 31d Street, on the east by Interstate 95, on <br />the South by a westerly extension of the SW 10th Street, and on the <br />west by the FEC Railroad Right -of -way. <br />This was deemed the City's most critical area of need <br />for drainage improvements as determined through <br />the 2013 Stormwater Master Plan. Using PCSWMM <br />computer modeling software (the commercial version <br />of US EPA SWMM5) CTA is reviewing Master Plan <br />assumptions and input data, refining design <br />parameters and developing additional alternatives to <br />lower flood elevations during the 5 year 24 hour, 10 <br />year 4 hour, and 100 year 72 hour storm events. <br />CRAVEN THOMPSON & ASSOCIATES. INC. 1 3563 NW 53« STREET, FORT LAUDERDALE, FL 33309 1 P 954.739.6400 <br />2 1 Page 28 <br />