My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RE-BID ITB # 23-10-01 JOINT PROCUREMENT CENTRAL ISLAND
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RE-BID ITB # 23-10-01 JOINT PROCUREMENT CENTRAL ISLAND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 1:29:03 PM
Creation date
10/13/2023 1:26:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net |Purchasing@sibfl.net <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />The Contractorhereby acknowledges and agrees that all materials, except where recycled content is <br />specifically requested, supplied by the Bidder in conjunction with this solicitation and resultant contract <br />shall be new, warranted for their merchantability, and fit for a particular purpose. In the event any of the <br />materials supplied to the City by the Contractor are found to be defective or do not conform to <br />specifications: (1) the materials may be returned to the Contractor at the Contractor’s expense and the <br />contract cancelled or (2) the City may require the Contractor to replace the materials at the Contractor’s <br />expense. No provisions or allotments for delays or time extensions to the schedule as a result of <br />“defective”, unacceptable material, or reused material found shall be granted. <br /> <br />In the event that material is suspected by the City of being reused or not new in original packaging, the <br />material may be rejected. The Contractor shall remove such material and replace it at his/her cost and <br />within the original schedule. No provisions or allotments for delays or time extensions to the schedule as <br />a result of “defective”, unacceptable material, or reused material found shall be granted. <br /> <br />2.21 ACCIDENT PREVENTION AND BARRICADES <br />Contractor shall comply with City, State and Federal regulations and permit requirements for the placement <br />of the proper Traffic Control Devices. Barricades, cones, construction fencing, temporary construction <br />fencing per City regulations and other relevant requirements, shall be provided by the Contractor when <br />work is performed in areas traversed by persons, vehicular traffic or when deemed necessary by the City <br />Project Manager(s) at no extra cost to the City. <br /> <br />Precautions shall be exercised at all times for the protection of persons and property. All services performed <br />under this contract shall conform to all relevant regulations as prescribed in the current edition of the <br />Manual of Uniform Traffic Control Devices (MUTCD), the Florida Department of Transportation’s Design <br />Standards (DS) and OSHA during the course of such effort. Where requirements vary or conflict, the more <br />stringent shall apply. Any fines levied by the above-mentioned authorities for failure to comply with these <br />requirements shall be borne solely by the Contractor. <br /> <br />2.22 SAFETY MEASURES: <br /> <br />Contractor shall take all necessary precautions for the safety of employees and shall erect and properly <br />maintain at all times all necessary safeguards for the protection of the employees and the public. <br />Contractor to follow all OSHA Safety Standards. Danger signs warning against hazards created by his/ her <br />operation and work in progress must be posted. <br /> <br />All employees of the contractor shall be expected to wear safety glasses or goggles, appropriate clothing, <br />and hearing protection when and wherever applicable. The contractor shall use only equipment that is fully <br />operational and in safe operating order. Contractor shall be especially careful when servicing property when <br />pedestrians and/ or vehicles are in close proximity work shall cease until it is safe to proceed. <br /> <br />2.23 HOURS OF CONSTRUCTION <br /> <br />The Contractor shall minimize the impact of this project on the general public ensuring that all service <br />interruptions are kept to a minimum and providing temporary services, structures, and facilities as required. <br />The existing service to the residents and businesses may not be interrupted for more than 4 hours without <br />written permission from the City. The Contractor may perform work between the hours 7:00 AM and 7:00 <br />PM Monday through Thursday and 7:00 AM – 5:00 PM on Fridays. Hours in the areas of the school may be <br />restricted during peak school traffic. Contractor shall consider school access for vehicles and pedestrians <br />when preparing MOT plans. Work outside these hours, on weekends, or holidays is prohibited without prior <br />permission from the applicable jurisdiction. <br />Re-bid City of Sunny Isles Beach & NMB Water| Drainage Improvements & Watermain Replacement 20 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.