Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net |Purchasing@sibfl.net <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />The Contractor is to maintain appropriate signage, guards, and flagmen for the purpose of safeguarding <br />the general public while work is ongoing. All work shall be completed in a safe and workmanlike manner <br />every day and the Contractor shall secure the site prior to leaving at the end of each and every day. <br /> <br />2.24 STAGING DELIVERY & STORAGE OF MATERIAL AND EQUIPMENT <br />All material must be F.O.B. destination. The Contractor is solely liable and responsible for the purchase, <br />delivery, and installation of all materials and equipment. The Contractor will make all arrangements for <br />delivery. Contractor will be solely liable for receiving, inspecting, accepting, and replacing any damaged <br />materials or equipment and filing any and all claim with suppliers or transporters. Contractor is responsible <br />for the protection of all materials and equipment from adverse weather conditions, damage, deterioration, <br />and theft until the Work has been accepted by the City. <br /> <br />Contractor is responsible for providing staging and storage area for construction. The City of Sunny Isles <br />Beach will allow staging and storage of materials within portions of the Right-of-Ways. The City of Sunny <br />Isles Beach is investigating a potential site at the St. Mary Magdalen Church, which will be confirmed at the <br />pre-bid meeting. If approved, the contractor will be responsible for coordinating this agreement directly <br />rd <br />party. <br />with the 3 <br /> <br />2.25 PROTECTION OF PROPERTY <br /> <br />The Bidder shall take extra precaution to protect all property while removing and replacing materials and <br />equipment. Any damage done by the Bidder, whether it is necessary to the installation or accidental, shall <br />be corrected to its original or better state, and shall be corrected to the satisfaction of the respective <br />agency. <br /> <br />2.26 DAMAGE TO PUBLIC OR PRIVATE PROPERTY <br /> <br />Extreme care shall be taken by Contractor to safeguard all existing facilities, site amenities, utilities, <br />irrigation systems on or around the job site. Damage to public and/or private property shall be the <br />responsibility of the Contractor and shall be repaired and/or replaced by Contractor at no additional cost <br />to the City. The Contractor shall use all means to protect existing objects, structures and vegetation <br />designated to remain. In the event of damage, the Contractor shall immediately make all repairs, <br />replacements and dressings to damaged materials, to the approval of the City, at no additional cost to the <br />City. <br /> <br />2.27 CLEAN-UP <br /> <br />Bidder shall remove and dispose of any dirt or debris resulting from this project. All debris shall be disposed <br />of at an authorized dumping facility. Dump tickets shall be submitted to the City with each pay request. <br />Exposed metal shall be polished, glass shall be cleaned, surrounding structures or landscaping affected or <br />damaged during completion of this project shall be restored to an equal or better condition. Paint shall be <br />touched up if and where needed. Bidder's equipment and surplus material shall be removed from site. <br /> <br />2.28 CORRECTION OR REMOVAL OF DEFECTIVE WORK <br />If required by City, Contractor shall promptly, as directed and at its sole expense, either correct all defective <br />Work, whether or not fabricated, installed or completed, or, if the Work has been rejected by City, remove <br />it from the site and replace it with non-defective Work. Contractor shall bear all direct, indirect, and <br />Re-bid City of Sunny Isles Beach & NMB Water| Drainage Improvements & Watermain Replacement 21 <br /> <br />