Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net |Purchasing@sibfl.net <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />In addition to any manufacturer’s warranties, Contractor warrants and guarantees to the Citythat all <br />work will be in strict accordance with the Contract Documents and will not be defective. All defective <br />Work, whether or not in place, may be rejected, corrected,or accepted as provided below. <br />2.31.1 Correcting Defects Covered Under Warranty <br />The Contractor shall be responsible for promptly correcting any deficiency, at no cost to the City, <br />within seven (7) calendar days after the City notifies the Contractor of such deficiency in writing. <br />If the Contractor fails to satisfy the warranty within the period specified in the notice, the City may <br />(a) place the Contractor in default of its contract, and/or (b) procure the products or services from <br />another source and charge the Contractor for any additional costs that are incurred by the City for <br />this work or items; either through a credit memorandum or through invoicing. <br /> <br />2.31.2 Owner May Stop the Work <br />If the Work is defective or Contractor fails to supply sufficiently skilled workers or suitable <br />materials or equipment or fails to furnish or perform the Work in such a way that the completed <br />Work will strictly conform to the Contract Documents, City may order Contractor to stop the Work, <br />or any portion thereof, until the cause for such order has been eliminated. However, this right of <br />City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the <br />benefit of Contractor or any other party. <br />2.32 ONE YEAR CORRECTION PERIOD <br />In the event any work is found to be defective within one year after the date of Final Completion, Contractor <br />shall promptly, without cost to the Cities and in accordance with their written instructions, either correct <br />such defective Work, or, if it has been rejected by the Cities, remove it from the site and replace it with <br />non-defective Work. If Contractor does not promptly comply with the terms of such instructions, or in an <br />emergency where delay would cause serious risk of loss or damage, City may have the defective Work <br />corrected or the rejected Work removed and replaced, and all direct, indirect, and consequential costs of <br />such removal and replacement (including but not limited to fees and charges of engineers, architects, <br />attorneys and other professionals) will be promptly paid by Contractor. Nothing in this ITB or the Contract <br />shall be construed as a limitation on any right or remedy for breach of the Contract or defects in the Work. <br />All rights set forth herein and, in the Contract, shall be deemed cumulative and in addition to any rights or <br />remedies which may be afforded by Florida law. <br /> <br />2.33 FRAUD AND MISREPRESENTATION <br />The Cities may terminate this Contract based on any attempt by the Contractor to meet its <br /> contractual obligations with the Cities through fraud, misrepresentation, or material misstatement. <br /> Should this occur, the Contractor will be responsible for all direct or indirect costs associated with <br /> termination or cancellation of the Contract. <br /> <br />2.34 PUBLIC RECORDS LAW <br /> <br />The Cities are subject to Chapter 119, Florida Statutes, “Public Records Law.” No claim of confidentiality or <br />proprietary information in all or any portion of a response will be honored unless a specific exemption from <br />the Public Law exists and is cited in the response. An incorrectly claimed exemption does not disqualify the <br />firm, only the exemption claimed. Contractor acknowledges the public shall have access at all reasonable <br />times, to all documents and information pertaining to City’s contracts, subject to the provisions of Chapter <br />Re-bid City of Sunny Isles Beach & NMB Water| Drainage Improvements & Watermain Replacement 23 <br /> <br />