My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Calvin Giordano & Assoc. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:25:05 AM
Creation date
8/28/2014 2:59:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering Svcs.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LANGAN <br />SERVICES <br />• Phase I and 11 Environmental Site <br />Assessments (ESA) <br />• Geotechnical Subsurface <br />Investigation <br />• Geotechnical Engineering and <br />Foundation Recommendations <br />LOCATION: <br />Homestead, Florida <br />CLIENT: <br />City of Homestead <br />ARCHITECT: <br />Rodriguez and Quiroga Architects <br />Chartered <br />I iI N `L <br />-0-0-0-0 -o oo-o°o-oo°_° i °° <br />00 0 0 o 0_ o 000_ob_oo_o_000 _000 oo <br />H�wbhwU CT' HALL <br />HOMESTEAD CITY HALL <br />The new Homestead City Hall project consists of a new 3- <br />story, approximately 80,000 SF building that will be used for <br />housing the administrative facilities for the City of Homestead <br />Municipal Government, including a 230 -seat auditorium and <br />council chambers. The project also includes an open plaza <br />and new surface parking lots. <br />Langan performed Phase I and Phase II Environmental Site <br />Assessments (ESA) as part of an ongoing continuing services <br />contract with the City of Homestead. The Phase I ESA <br />identified some potential environmental concerns associated <br />with both on -site and off -site recognized environmental <br />conditions. A limited Phase 11 ESA was performed to <br />evaluate the potential impact to the site from these conditions. <br />Langan also performed a subsurface investigation and <br />provided foundation recommendations for the design of the <br />new facilities. Economical shallow spread footing foundations <br />were recommended for support of the structure. In addition, <br />percolation tests were performed to obtain the soil <br />permeability data required for the design of the stormwater <br />drainage system. <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.