My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Calvin Giordano & Assoc. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:25:05 AM
Creation date
8/28/2014 2:59:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering Svcs.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°a <br />0 <br />Calvin. Giordano 8 Associates, Inc. <br />E X C E P i 1 0 N A t S O I U E 1 0 N S <br />PROJECT MANAGER EXPERIENCE <br />Mr. Robert McSweeney, PE, <br />has more than 25 years of <br />local experience in South <br />Florida including municipal <br />engineering, civil engineer- <br />ing along with related plan- <br />ning, permitting, design and <br />construction administration. <br />His main focus over the past <br />14 years has been in the ser- <br />vice of municipal and gov- <br />ernmental clients. This work has involved large scale <br />FDOT and County roadway projects including an inter- <br />change construction on the HEFT (Homestead Exten- <br />sion of Florida's Turnpike), NW 12th Street Widening <br />(Miami -Dade County), and the Hillsboro Boulevard <br />Streetscape project (Deerfield Beach); utility infra- <br />structure upgrading and neighborhood improvement <br />projects including storm water (drainage) systems, <br />drainage pump stations, water main upgrades and <br />replacements, gravity sanitary sewer system replace- <br />ment and lining, reuse water main installations, sew- <br />er pump station(s) replacements and rehabilitations, <br />and transmission force main replacements, and traffic <br />calming improvements; and Municipal engineering, <br />development review and representation. <br />Sample engineering design and /or construction ad- <br />ministration projects include the Surfside drainage <br />pump stations, Fort Lauderdale Harbor Beach Neigh- <br />borhood Utility Improvements, Pompano Beach 24" <br />reuse water main (one mile in length through a resi- <br />dential neighborhood), Pompano Beach island bridge <br />replacement project, Plantation bridge /culvert re- <br />placement project, Dania /Meadowbrook drainage <br />pump station, and Weston roadway resurfacing and <br />traffic calming projects. He understands the necessary <br />efforts and intricacies in serving and managing munic- <br />ipal clients and regulatory agencies as well as dealing <br />with the public and acting as a liaison to the Commis- <br />sion, municipal staff, residents and business owners. <br />These efforts include the process of overseeing the <br />design, management and construction of scheduled <br />improvements, and ensuring final completion of the <br />project for a successful close -out. <br />See below for a detailed description of some projects <br />Mr. McSweeney has performed. <br />• Fort Lauderdale Neighborhood Improve- <br />ments Projects (Estimated Construction <br />Cost(s) $9M): (2004 - 2007) Construction <br />Administrator for neighborhood improvement <br />projects including drainage improvements/ <br />modifications, utility installations (water <br />mains /services, water transmission mains <br />and force mains, and bridge utility crossing <br />replacements), utility rehabilitations (sanitary <br />sewer gravity main and lateral lining /CIPP, lift <br />station rehabilitation /reconstruction), road- <br />way restoration and reconstruction, traffic <br />calming and intersection improvements, road- <br />way lighting, landscaping and irrigation, and <br />pavement markings and signage. <br />• City of Pompano Beach Reclaimed (Reuse) <br />Main (Estimated Construction Cost $2.2M): <br />(2007- 2008) Contract Manager /Engineer of <br />Record / Construction Administrator for S,000 <br />LF of 24" reuse transmission main and asso- <br />ciated distribution mains and services located <br />within an existing residential neighborhood <br />involving directional bore installation and <br />open cut, complete roadway restoration, and <br />Swale improvements. <br />• Deerfield Beach Hillsboro Blvd. (S.R.810) <br />Roadway Corridor Improvements (Estimat- <br />ed Construction Cost $6.SM): (2007 - 2010) <br />Engineer of Record /Contract Administrator, <br />project included engineering design for re- <br />construction and improvements to approx. <br />4,800 linear feet of roadway (Hillsboro Bou- <br />levard/S.R. 810) from Federal Highway to S.R. <br />A -1 -A. Improvements included roadway cross- <br />♦{( t RFQ No. 14 -07 -02 1 Continuing Professional Services 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.