My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Wolfberg Alvarez & Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:04:32 PM
Creation date
8/28/2014 3:19:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and svcs.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ensure the availability of the resources to respond to <br />multiple schedule demands. <br />The commitment of the firm to provide professional <br />excellence and responsiveness for this project will <br />remain uncompromised while meeting established <br />schedules. The projected work load for our collective <br />firms and staffing levels, combined with the avail- <br />ability of an experienced team of professionals in all <br />disciplines will enable our team not only to maintain <br />continuing schedule control, but best satisfy the to- <br />tal needs of this project. As an example of the firm's <br />ability to meet or beat project schedules, below are <br />four project examples where WA has beat the origi- <br />nal design schedule. <br />Quality Control <br />WA employs a comprehensive firm -wide Quality As- <br />surance Program. The following Quality Assurance <br />Procedures are instituted for each project: <br />• A kick -off and goals setting meeting is held to <br />review the project scope and determine the re- <br />quirements for each discipline. A project man- <br />agement and quality assurance plan is prepared <br />and agreed upon at the onset of the project de- <br />sign phase. <br />• At each phase of document submittal, all review <br />comments are addressed and evaluated in a full <br />design team meeting, including the CM. <br />Project coordination checklists are used for each <br />design phase. Quality Assurance responsibilities <br />of each team member are clearly documented <br />and a staff member not otherwise involved with <br />the project is assigned as an independent quali- <br />ty control professional. <br />WA assigns a quality control manager to review the <br />documents for constructability and general coordi- <br />nation disciplines. The project manager and project <br />coordinator review the documents for incorporation <br />of all items in the scope services. The project is also <br />reviewed by the department heads in each discipline <br />for accuracy and completeness. A member of the <br />specifications department reviews each phase with <br />the project manager to coordinate the specifications. <br />CITY OF SUNNY ISLES BEACH <br />RFQ No. 14 -07 -02 C,S <br />WOLFBERG ALVAREZ 8 PARTNERS <br />Project Milestones and Phases <br />The initial phase of the project entails Program <br />PreparationNerification wherein the specific func- <br />tions, areas, uses, etc. of the project are clearly <br />delineated and documented. This includes not only <br />physical requirements but other aspects such as <br />budget, schedule, operation for each component and <br />other parameters affecting the design. Concurrently, <br />the team will be performing Due Diligence including <br />code analysis, existing site conditions, easements, <br />utilities, planning requirements, FEMA and perform- <br />ing geotechnical analysis and land surveying. <br />From this phase, the project will proceed to the Mas- <br />ter Plan /Conceptual Design stage which is defined <br />above in detail, concluding in what the City identifies <br />as the Basis of Design Report (BODR). Once a gen- <br />eral consensus has been reached and notification <br />issued by the City of acceptance, the project will <br />commence with the subsequent phase: Schematic <br />Design. <br />Upon recommendation for approval the next phase <br />is Design Development. This phase results in more <br />defined and completed drawings and delineates the <br />engineering and systems components with regard to <br />type, size, characteristics, quality, etc. This level of <br />information allows for a more detailed construction <br />cost estimate to compare with the City's budget and <br />to make the necessary adjustments. <br />The final phase in the document preparation stage is <br />the preparation of Construction Documents, wherein <br />all of the specifics of the project are completely and <br />clearly documented for permitting, bidding (and /or <br />assisting the CM if the City elects this method) and <br />ultimately for erection of the facilities. The City typi- <br />cally requires that this phase be further sub - divided <br />with document submission for review and provided <br />at the following milestones: 30 %, 60 %, 90% and fi- <br />nal. <br />All of these phases are reviewed in -house by our <br />Quality Assurance /Quality Control Team. This is <br />an independent team of professionals, not active- <br />ARCHITECTURE <br />ENGINEERING <br />PLANNING <br />INTERIOR DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.