My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INVITATION TO BID 23-11-01 STREET LIGHTING PREVENTATIVE MAINTENANCE & AS-NEEDED SERVICES
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-11-01) Street Lighting Preventatitve Maintenance As-Needed Electrical Services
>
INVITATION TO BID 23-11-01 STREET LIGHTING PREVENTATIVE MAINTENANCE & AS-NEEDED SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2023 1:09:51 PM
Creation date
11/6/2023 1:09:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />21 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />i) Perform a visual <br />inspection of the illumination <br />pattern for correctness. <br /> <br />j) Check light bulbs and <br />Ballasts <br /> <br />k) Fix and or report any damage <br />skirts. <br /> <br />l) Removal and report of graffiti. <br />m) check the controls for each <br />section of lighting, either Photo <br />cell or timeclocks and the service <br />disconnects, fused disconnect or <br />circuit breaker enclosure for <br />each section of lighting <br /> <br /> <br />The Contractor shall also supply and install all items necessary to ensure proper functioning of <br />the Lighting System, including photocell(s), ground wire to be made to the ground lug in the <br />pole base as shown on the electrical diagram, inline fuses and holders, non-delay fuses 5 – 10 <br />amp time delay 300 volt or 600 capacity for each pole accordingly, and appropriate connectors, <br />miscellaneous wiring and appurtenant items. <br /> <br /> UTILITY LOCATIONS: <br /> <br />It is the Contractor's responsibility to call for and coordinate all Electrical Utility markings with <br />Sunshine State One Call. <br /> <br />VOLTAGE: <br />The Contractor shall verify the appropriate voltage of the work to be performed on site. <br /> <br />TRENCH RESTORATION AND COMPACTING: <br />Trench restoration, compacting, and pavement restoration shall be done by the Contractor, per <br />City standards and the FDOT Construction Standards. <br /> <br />The Contractor shall immediately report street light outages and/or disruptions found requiring <br />repairs and perform minor work, including but not limited to adjusting or replacing luminaries, <br />lamps, parabolic lenses, replacing fuses, and photocells. All lighting outages shall be attended to <br />within 48 hours of being reported by the Public Works-Operations. <br /> <br />The Contractor must maintain at a minimum 90% of the lights working as per Contractor nightly <br />inspection and the Public Works-Operations staff. <br /> <br />Perform repairs reported by the patrol crews or directed by Public Works-Operations every <br />Monday through Friday. <br />
The URL can be used to link to this page
Your browser does not support the video tag.