My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Replacement of 48" FM Project No. 9088 <br />(Design/Build) <br />Owner: Broward County WWSS - $4,418,669 <br />Reference: Alan Garcia, PWD Director ‐ 954‐831‐0903 <br />Role: General Manager/Project Manager <br />The Project was located in an Urban Area adjacent <br />to Florida's turnpike. The project consisted of 48" <br />force main relocation, requiring careful demolition <br />of existing pipe, connections to existing FM, shoring <br />and de‐watering, deep excavation, difficult access <br />and coordination to Florida's Turnpike traffic. <br />Support and exploration of main gas lines and other <br />utilities. Restoration of road and property adjacent <br />to residences. <br />NE 163rd Street Emergency Repair of 42‐Inch PCCP <br />Owner: Miami‐Dade Water & Sewer Department - <br />$848,027 <br />Reference: Joe Armao ‐ 786‐586‐4198 <br />Role: General Manager / Project Manager <br />Project was an emergency repair of a failing 42" <br />PCCP Force Main requiring replacement right to the <br />Master Pump Station wet well. Extensive DOT MOT <br />on NE 163rd St, demolition of existing PCCP pipe, <br />sheeting and shoring, deep excavations, de‐ <br />watering, extensive by‐pass pumping, use of link‐ <br />seals, closures and pipe alignment to existing <br />connection points. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.